Solving the integrated forest harvest scheduling model using metaheuristic algorithms

被引:3
|
作者
Naderializadeh, Nader [1 ]
Crowe, Kevin A. [1 ]
Rouhafza, Melika [1 ]
机构
[1] Lakehead Univ, Fac Nat Resources Management, 955 Oliver Rd, Thunder Bay, ON P7B 5E1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Forest management planning; Harvest-scheduling model; Fixed charge network design model; Simulated annealing; Integrated model; SEARCH; OPTIMIZATION; CONSTRAINTS; HEURISTICS; DESIGN;
D O I
10.1007/s12351-020-00612-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In forestry, the highest operational costs arise from the construction of forest roads and the transportation of harvested wood. Hence, optimization models have been used at the tactical level of planning to reduce these costs by integrating decisions on: (1) the allocation of harvest-blocks, (2) the allocation of access roads to these blocks, and (3) the transportation costs that result from the latter two decisions. The integration of these three decisions, in one optimization model, has been referred to as the integrated model. The integrated model, when binary decision variables are used to represent the cut-blocks and roads, is NP-hard and has been solved using two approaches: exact and metaheuristic algorithms. Unlike exact methods, metaheuristic algorithms have thus far not solved the integrated model, but have solved models which either exclude transportation costs from the objective function, or solve the model sequentially. This is a significant gap in prior research because exact solution methods can only be used on smaller forests and metaheuristic algorithms have therefore been used to solve the tactical forest planning problem, without the integration of transportation costs, on large forests. This failure to integrate transportation costs, on a large scale, is the major economic consequence of this gap. The objective of this paper is to present and evaluate a new solution procedure in which all three elements of the integrated tactical planning model are included in the objective function and solved using metaheuristics. The solution procedure was applied to three forests and the attributes and qualities of the solutions were compared to near-optimal solution values generated using an exact solution approach. The results indicate that this metaheuristic procedure generated good quality solutions. We conclude that this research is a useful first step in representing transportation costs in the integrated tactical planning models to be solved using metaheuristics.
引用
收藏
页码:2437 / 2463
页数:27
相关论文
共 50 条
  • [1] Solving the integrated forest harvest scheduling model using metaheuristic algorithms
    Nader Naderializadeh
    Kevin A. Crowe
    Melika Rouhafza
    Operational Research, 2022, 22 : 2437 - 2463
  • [2] Solving Integrated Process Planning, Dynamic Scheduling, and Due Date Assignment Using Metaheuristic Algorithms
    Erden, Caner
    Demir, Halil Ibrahim
    Kokcam, Abdullah Hulusi
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [3] COMPARISON THE METAHEURISTIC SIMULATED ANNEALING AND INTEGER LINEAR PROGRAMMING FOR SOLVING THE FOREST HARVEST SCHEDULING WITH ADJACENCY CONSTRAINTS
    Gomide, Lucas Rezende
    Arce, Julio Eduardo
    Lindbeck da Silva, Arinei Carlos
    CIENCIA FLORESTAL, 2013, 23 (02): : 449 - 460
  • [4] A Mathematical Model for the Integrated Optimization of Harvest and Transport Scheduling of Forest Products
    Velloso Henriques dos Santos, Paulo Amaro
    Lindbeck da Silva, Arinei Carlos
    Arce, Julio Eduardo
    Augustynczik, Andrey Lessa Derci
    FORESTS, 2019, 10 (12):
  • [5] FOREST HARVEST SCHEDULING PLAN INTEGRATED TO THE ROAD NETWORK
    Belavenutti, Pedro Henrique
    da Silva, Martins
    Arce, Julio Eduardo
    Loch, Gustavo Valentim
    David, Hassan Camil
    Fiorentin, Luan Demarco
    CERNE, 2016, 22 (01) : 69 - 75
  • [6] An Integrated Model for Developing a Global Logistics Network Using Metaheuristic Algorithms
    Karimi Mehrabadi, Reza
    Roghanian, Emad
    Piroozfar, Shahnaz
    Shojaie, Abbas
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2025, 32 (02): : 433 - 444
  • [7] A review of metaheuristic algorithms for solving TSP-based scheduling optimization problems
    Toaza, Bladimir
    Esztergar-Kiss, Domokos
    APPLIED SOFT COMPUTING, 2023, 148
  • [8] Formulating the integrated forest harvest-scheduling model to reduce the cost of the road-networks
    Naderializadeh, Nader
    Crowe, Kevin A.
    OPERATIONAL RESEARCH, 2020, 20 (04) : 2283 - 2306
  • [9] Formulating the integrated forest harvest-scheduling model to reduce the cost of the road-networks
    Nader Naderializadeh
    Kevin A. Crowe
    Operational Research, 2020, 20 : 2283 - 2306
  • [10] Efficiency in forest management: A multiobjective harvest scheduling model
    Hernandez, M.
    Gomez, T.
    Molina, J.
    Leon, M. A.
    Caballero, R.
    JOURNAL OF FOREST ECONOMICS, 2014, 20 (03) : 236 - 251