COMPREHENSIVE RISK MANAGEMENT USING FUZZY FMEA AND MCDA TECHNIQUES IN HIGHWAY CONSTRUCTION PROJECTS

被引:72
作者
Ahmadi, Mohsen [1 ]
Behzadian, Kourosh [2 ]
Ardeshir, Abdollah [1 ]
Kapelan, Zoran [2 ]
机构
[1] Amirkabir Univ Technol, Dept Civil & Environm Engn, Tehran, Iran
[2] Univ West London, Sch Comp & Engn, London W5 5RF, England
关键词
risk management; response actions; risk strategy; fuzzy AHP; fuzzy FMEA; ROAD CONSTRUCTION; HIERARCHY PROCESS; SELECTION;
D O I
10.3846/13923730.2015.1068847
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a comprehensive framework to manage the main risk events of highway construction projects within three stages: (1) identification of potential risks; (2) assessment and prioritisation of identified risks based on fuzzy FMEA; (3) identification of appropriate response. The main criteria analysed for prioritising potential risk events are cost, time and quality which are quantified and combined using fuzzy AHP. A new expert system is suggested for identifying an appropriate risk response strategy for a risk event based on risk factor, control number and risk allocation. The best response action for a risk event is then identified with respect to the same criteria using "scope expected deviation" (SED) index. The proposed methodology is demonstrated for management of risk events in a construction project of Bijar-Zanjan highway in Iran. For the risk event of "increase in tar price", deviation from the target values of the criteria is analysed for business-as-usual state plus two risk response actions using SED index. The results show that the response action of "changing paving construction technology from asphalt pavement to RCC pavement" can successfully cope with the risk event of "increase in tar price" and have the minimum deviation.
引用
收藏
页码:300 / 310
页数:11
相关论文
共 29 条
[1]   Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis [J].
Abdelgawad, Mohamed ;
Fayek, Aminah Robinson .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (04) :294-302
[2]   Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP [J].
Abdelgawad, Mohamed ;
Fayek, Aminah Robinson .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (09) :1028-1036
[3]  
Al-Abdul Wahhab H. I., 1994, TRANSPORT RES REC, V1458, P1
[4]  
[Anonymous], 2008, A Guide to the Project Management Body of Knowledge (PMBOK Guide), V4th
[5]   Selection of a Bridge Construction Site Using Fuzzy Analytical Hierarchy Process in Geographic Information System [J].
Ardeshir, Abdollah ;
Mohseni, Nasir ;
Behzadian, Kourosh ;
Errington, Mark .
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2014, 39 (06) :4405-4420
[6]  
Ashley D. B., 2006, FHWAPL06032 US DEP T
[7]  
Carbone T.A., 2004, ENG MANAG J, V16, P28, DOI 10.1080/10429247.2004.11415263
[8]  
COOPER D., 2005, PROJECT RISK MANAGEM
[9]   Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects [J].
Creedy, Garry D. ;
Skitmore, Martin ;
Wong, Johnny K. W. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) :528-537
[10]  
Diab M. F., 2012, P 48 ASC ANN INT C 1