Scheduling in iron ore open-pit mining

被引:8
作者
Ibrahimov, Maksud [1 ]
Mohais, Arvind [1 ]
Schellenberg, Sven [2 ]
Michalewicz, Zbigniew [1 ,3 ,4 ]
机构
[1] Univ Adelaide, Sch Comp Sci, Adelaide, SA 5005, Australia
[2] RMIT Univ, Sch Comp Sci & IT, Melbourne, Vic, Australia
[3] Polish Acad Sci, Inst Comp Sci, PL-01237 Warsaw, Poland
[4] Polish Japanese Inst Informat Technol, PL-02008 Warsaw, Poland
关键词
Open-pit mining; Scheduling; Metaheuristics; Real-world application; SEARCH ALGORITHM;
D O I
10.1007/s00170-014-5619-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained problem with some of the constraints changing over time. The objective is to generate a plan that meets the quality and tonnage targets by utilising the provided equipment and machines. The mathematical model is described in detail, and a three-module complex algorithm based on computational intelligence is proposed. The main software functionality is also described. The developed software is currently in the production use.
引用
收藏
页码:1021 / 1037
页数:17
相关论文
共 50 条
  • [21] The Deterioration of Geoheritage in the Central Spanish Volcanic Region by Open-Pit Mining
    Poblete Piedrabuena, Miguel Angel
    Marti Molist, Joan
    Beato Bergua, Salvador
    Marino Alfonso, Jose Luis
    GEOHERITAGE, 2019, 11 (04) : 1903 - 1917
  • [22] Impact of the Type of Energetic Material on the Fume Emission in Open-Pit Mining
    Biessikirski, Andrzej
    Dworzak, Michal
    Pytlik, Mateusz
    Nachlik, Sonia
    SUSTAINABILITY, 2025, 17 (05)
  • [23] The Deterioration of Geoheritage in the Central Spanish Volcanic Region by Open-Pit Mining
    Miguel Ángel Poblete Piedrabuena
    Joan Martí Molist
    Salvador Beato Bergua
    José Luis Marino Alfonso
    Geoheritage, 2019, 11 : 1903 - 1917
  • [24] Open-Pit Mining Operational Planning using Multi Agent Systems
    Cohen, Miri Weiss
    Coelho, Vitor Nazario
    KNOWLEDGE-BASED AND INTELLIGENT INFORMATION & ENGINEERING SYSTEMS (KSE 2021), 2021, 192 : 1677 - 1686
  • [25] Technology Management and Innovation in Open-Pit Peruvian Mining: Case Studies
    Merma, Yannick Patrick Carrasco
    HUMAN-CENTRED TECHNOLOGY MANAGEMENT FOR A SUSTAINABLE FUTURE, VOL 2, IAMOT, 2025, : 373 - 381
  • [26] ROAD NETWORK DEVELOPMENT ANALYSIS IN AREAS AFFECTED BY OPEN-PIT MINING
    Pacina, Jan
    Popelka, Jan
    Novak, Petr
    INFORMATICS, GEOINFORMATICS AND REMOTE SENSING, VOL I (SGEM 2015), 2015, : 785 - 792
  • [27] Comparison of Trajectory and Population-Based Algorithms for Optimizing Constrained Open-Pit Mining Problem
    Rahimi, Iman
    Picard, Theodore
    Morabito, Andrew
    Pampalis, Kiriakos
    Abignano, Aiden
    Gandomi, Amir H.
    2022 9TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING & MACHINE INTELLIGENCE, ISCMI, 2022, : 109 - 112
  • [28] REMEDIATION OF SOIL DISTURBED BY OPEN-PIT MINING WITH THE HELP OF BIO-COAL
    Sheinkman, L. E.
    Ivlieva, M. S.
    PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2023, 4 : 151 - 158
  • [29] A real-world mine excavators timetabling methodology in open-pit mining
    Liu, Shi Qiang
    Kozan, Erhan
    Corry, Paul
    Masoud, Mahmoud
    Luo, Kai
    OPTIMIZATION AND ENGINEERING, 2023, 24 (03) : 1493 - 1535
  • [30] In-pit crushing and conveying technology in open-pit mining operations: a literature review and research agenda
    Osanloo, Morteza
    Paricheh, Morteza
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2020, 34 (06) : 430 - 457