Scheduling in iron ore open-pit mining

被引:8
|
作者
Ibrahimov, Maksud [1 ]
Mohais, Arvind [1 ]
Schellenberg, Sven [2 ]
Michalewicz, Zbigniew [1 ,3 ,4 ]
机构
[1] Univ Adelaide, Sch Comp Sci, Adelaide, SA 5005, Australia
[2] RMIT Univ, Sch Comp Sci & IT, Melbourne, Vic, Australia
[3] Polish Acad Sci, Inst Comp Sci, PL-01237 Warsaw, Poland
[4] Polish Japanese Inst Informat Technol, PL-02008 Warsaw, Poland
来源
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 2014年 / 72卷 / 5-8期
关键词
Open-pit mining; Scheduling; Metaheuristics; Real-world application; SEARCH ALGORITHM;
D O I
10.1007/s00170-014-5619-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained problem with some of the constraints changing over time. The objective is to generate a plan that meets the quality and tonnage targets by utilising the provided equipment and machines. The mathematical model is described in detail, and a three-module complex algorithm based on computational intelligence is proposed. The main software functionality is also described. The developed software is currently in the production use.
引用
收藏
页码:1021 / 1037
页数:17
相关论文
共 50 条
  • [1] Scheduling in iron ore open-pit mining
    Maksud Ibrahimov
    Arvind Mohais
    Sven Schellenberg
    Zbigniew Michalewicz
    The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1021 - 1037
  • [2] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [3] Stability Analysis and Optimized Slope Angle for the Iron Ore Open-Pit Mine
    Akdag, S.
    Basarir, H.
    Karpuz, C.
    Ozyurt, M.
    PROCEEDINGS OF THE 24TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, IMCET 2015, 2015, : 606 - 611
  • [4] Energy efficient scheduling of open-pit coal mine trucks
    Patterson, S. R.
    Kozan, E.
    Hyland, P.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 759 - 770
  • [5] A novel model for sustainable production scheduling of an open-pit mining complex considering waste encapsulation
    Lin J.
    Asad M.W.A.
    Topal E.
    Chang P.
    Huang J.
    Lin W.
    Resources Policy, 2024, 91
  • [6] Machine learning for open-pit mining: a systematic review
    Liu, Shi Qiang
    Liu, Lizhu
    Kozan, Erhan
    Corry, Paul
    Masoud, Mahmoud
    Chung, Sai-Ho
    Li, Xiangong
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2025, 39 (01) : 1 - 39
  • [7] Research on Intrinsic Safety Method for Open-pit Mining
    Zheng Kaihuan
    Jiang Fuchuan
    INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND ENGINEERING IN CHINA, 2012, 2012, 43 : 453 - 458
  • [8] Comparative study on the economy of hybrid mining trucks for open-pit mining
    Jin, Chun
    Yi, Tong
    Shen, Yanhua
    Khajepour, Amir
    Meng, Qingyong
    IET INTELLIGENT TRANSPORT SYSTEMS, 2019, 13 (01) : 201 - 208
  • [9] A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
    Lamghari, Amina
    Dimitrakopoulos, Roussos
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 222 (03) : 642 - 652
  • [10] A maximum flow formulation of a multi-period open-pit mining problem
    Henry Amankwah
    Torbjörn Larsson
    Björn Textorius
    Operational Research, 2014, 14 : 1 - 10