Corrective maintenance timetable in restructured distribution environment

被引:5
作者
Scutariu, Mircea
Albert, Hermina
机构
[1] ELECTRICA Muntenia Sud Distribut & Supply Co, RO-11172 Bucharest, Romania
[2] Soc Power Engn Romania, RO-020371 Bucharest, Romania
关键词
maintenance practice; power distribution; probabilities; reliability;
D O I
10.1109/TPWRD.2006.881429
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Outsourcing of maintenance activities from the core distribution operator business prompted the reorganization of the operations sequence of activities and affects, to some extent, the reliability of the distribution network. Repair times, a major component in the reliability calculations, arrive to a new understanding from operations point of view and the adequacy of established probabilistic representations has to be assessed. This paper proposes a mechanism to identify the layout of the sequence of activities for distribution component repair, resulting from reorganization, and revises the adequate representation of the times associated with various stages of the derived repair process. Statistical-based techniques employing estimates of distribution parameters and hypothesis testing serve to determine probabilistic distributions. The validity of the independence assumption for the random variables associated with individual times which compose the repair time is checked via statistical methods in order to confirm applicability of probabilistic-based calculations. By means of such a mechanism, an objective analysis of the time components of the repair time can be conducted, such as areas of improvement, and can be outlined. The results obtained for a large real power distribution system are presented.
引用
收藏
页码:650 / 657
页数:8
相关论文
共 21 条
[1]  
ALBERT H, 2004, ENERGETICA REV, V52, P283
[2]  
ALBERT H, 2002, ENERGETICA REV, V50
[3]  
Billinton R., 1984, RELIABILITY EVALUATI
[4]  
Brown R.E., 2002, C SERV DAT CTR EN EF, V2nd
[5]   Automated primary distribution system design: Reliability and cost optimization [J].
Brown, RE ;
Gupta, S ;
Christie, RD ;
Venkata, SS ;
Fletcher, R .
IEEE TRANSACTIONS ON POWER DELIVERY, 1997, 12 (02) :1017-1022
[6]   Distribution system reliability assessment using hierarchical Markov modeling [J].
Brown, RE ;
Gupta, S ;
Christie, RD ;
Venkata, SS ;
Fletcher, R .
IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (04) :1929-1934
[7]   Impact of two-stage service restoration on distribution reliability [J].
Brown, RE ;
Hanson, AP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :624-629
[8]   Evaluation of the probability density functions of distribution system reliability indices with a characteristic functions-based approach [J].
Carpaneto, E ;
Chicco, G .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (02) :724-734
[9]  
CARPANETO E, 2004, 5 WORLD EN SYST C OR
[10]   Time of outage restoration analysis in distribution systems [J].
Chow, MY ;
Taylor, LS ;
Chow, MS .
IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (03) :1652-1658