Day-ahead scheduling of virtual power plant in joint energy and regulation reserve markets under uncertainties

被引:89
作者
Shayegan-Rad, Ali [1 ]
Badri, Ali [1 ]
Zangeneh, Ali [1 ]
机构
[1] Shahid Rajaee Teacher Training Univ, Dept Elect Engn, POB 1678815811, Tehran, Iran
关键词
Virtual power plant; Distributed energy resources; Energy and regulation reserve markets; Point estimate method; ANCILLARY SERVICES; BIDDING STRATEGY; PART II; WIND; FLOW; INTEGRATION; RESOURCES; SYSTEM; MODEL;
D O I
10.1016/j.energy.2017.01.006
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper presents a day-ahead scheduling framework for virtual power plant (VPP) in a joint energy and regulation reserve (RR) markets. The proposed VPP clusters a mix of generation units in term of synchronous distributed generation (SDG) and wind power plant (WPP) as well as storage facilities such as electrical vehicles (EVs) and small pumped storage plant (PSP). It is assumed that VPP provides required RR through its SDG and small PSP based on the delivery request probability of day-ahead market. In order to aggregate EVs, the VPP establishes bilateral incentive contracts with vehicle owners. Moreover, impact of carbon dioxide (CO2)emission of SDG is included by means of penalty cost function. Different uncertain parameters with regard to wind generation, EV owner behaviors, energy and RR market prices and regulation up and down probabilities are considered using a point estimate method (PEM). The case studies are applied to demonstrate the effectiveness of the scheduling model. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:114 / 125
页数:12
相关论文
共 35 条
[1]  
Abbasi E, 2010, P ENERGYCON, P1
[2]  
[Anonymous], 2013, IBM ILOG CPLEX 12 6
[3]  
[Anonymous], 2009, 2009 CIGRE IEEE PES
[4]  
[Anonymous], 1997, VIRTUAL UTILITY ACCO
[5]  
[Anonymous], IEEE EN 2030 C
[6]   Cost and emission impacts of virtual power plant formation in plug-in hybrid electric vehicle penetrated networks [J].
Arslan, Okan ;
Karasan, Oya Ekin .
ENERGY, 2013, 60 :116-124
[7]   Point estimate method for probabilistic load flow of an unbalanced power distribution system with correlated wind and solar sources [J].
Delgado, C. ;
Dominguez-Navarro, J. A. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 61 :267-278
[8]  
Energy Power Research Institute (EPRI), 2011, PLUGG CUST GUID EL V
[9]   Integrated day-ahead and hour-ahead operation model of discos in retail electricity markets considering DGs and CO2 emission penalty cost [J].
Ghadikolaei, Hadi Moghimi ;
Tajik, Elham ;
Aghaei, Jamshid ;
Charwand, Mansour .
APPLIED ENERGY, 2012, 95 :174-185
[10]   Hourly demand response and battery energy storage for imbalance reduction of smart distribution company embedded with electric vehicles and wind farms [J].
Ghasemi, Ahmad ;
Mortazavi, Seyed Saeidollah ;
Mashhour, Elaheh .
RENEWABLE ENERGY, 2016, 85 :124-136