Flow shop scheduling with flexible processing times

被引:4
作者
Bultmann, Matthias [1 ]
Knust, Sigrid [1 ]
Waldherr, Stefan [2 ]
机构
[1] Univ Osnabruck, Inst Comp Sci, Osnabruck, Germany
[2] Tech Univ Munich, Dept Informat, Munich, Germany
关键词
Scheduling; Flow shop; Flexible processing times; Processing time redistribution; SEQUENCING PROBLEM; MACHINE; MAKESPAN; JOBS;
D O I
10.1007/s00291-018-0520-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In numerous flow shop variants, the processing times of the operations are not fixed in advance, but may be distributed with some flexibility among the machines. In this paper, we introduce a general model which is expressive enough to cover several models from the literature. While in most cases it is -hard to find a job permutation and a corresponding distribution of processing times minimizing the makespan, we show that for a fixed job permutation a best processing time distribution can be calculated in polynomial time by linear programming. Based on this, we propose a tabu search procedure using the set of all job permutations as search space. In a computational study, we show the power of the new model. Besides the classical permutation flow shop environment, we study variants with blocking, no-wait and synchronous movement constraints.
引用
收藏
页码:809 / 829
页数:21
相关论文
共 25 条
[1]  
[Anonymous], THESIS
[2]  
[Anonymous], 2012, FLOW SHOP SCHEDULING
[3]   SEQUENCING JOBS ON AN AUTOMOBILE ASSEMBLY-LINE - OBJECTIVES AND PROCEDURES [J].
BOLAT, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (05) :1219-1236
[4]   Sequencing and scheduling in flowshops with task redistribution [J].
Burdett, RL ;
Kozan, E .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (12) :1379-1389
[5]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[6]   SEQUENCING 1 STATE-VARIABLE MACHINE - SOLVABLE CASE OF TRAVELING SALESMAN PROBLEM [J].
GILMORE, PC ;
GOMORY, RE .
OPERATIONS RESEARCH, 1964, 12 (05) :655-&
[7]  
Graham R. L., 1979, Discrete Optimisation, P287
[8]   Flowshop scheduling research after five decades [J].
Gupta, JND ;
Stafford, EF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (03) :699-711
[9]   Scheduling three-operation jobs in a two-machine flow shop to minimize makespan [J].
Gupta, JND ;
Koulamas, CP ;
Kyparisis, GJ ;
Potts, CN ;
Strusevich, VA .
ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) :171-185
[10]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525