Workflow Planning in Holonic Manufacturing Systems with Extended Contract Net Protocol

被引:0
|
作者
Hsieh, Fu-Shiung [1 ]
Chiang, Chih Yi [1 ]
机构
[1] Chaoyang Univ Technol, Dept Comp Sci & Informat Engn, Taichung Cty 41349, Taiwan
来源
NEXT-GENERATION APPLIED INTELLIGENCE, PROCEEDINGS | 2009年 / 5579卷
关键词
Holonic manufacturing system; contract net; workflow; ARCHITECTURE;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Holonic manufacturing systems (HMS) provide a reconfigurable and flexible architecture based on the notion of holon to dynamically meet customers' requirements. Given an order with specific product demands and due date, a challenge is to design a problem solving platform to guide the holons in HMS such that the decisions made by the individual holons as a whole fulfill the order. The objective of this paper is to propose a problem solving platform that finds a set of minimal cost holons and the associated workflows to fulfill an order. To achieve these objectives, we combine multi-agent systems technology with Petri nets to design and implement HMS to fulfill the requirements of orders. We first propose architecture and a two-layer contract net protocol for planning order holons, product holons and resource holons in HMS. To determine whether it is feasible for a set product holons and resource holons to meet the order requirements, we propose Petri net models to capture the workflows and activities in product holons and resource holons, respectively. To realize the two-layer contract net protocol, we proposed a scheme for publication and discovery of holon services based on FIPA compliant multi-agent system platform. We develop a HMS system to solve the order planning problem.
引用
收藏
页码:701 / 710
页数:10
相关论文
共 50 条
  • [1] Modeling and control of holonic manufacturing systems based on extended contract net protocol
    Hsieh, FS
    PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 5037 - 5042
  • [2] Holarchy formation and optimization in holonic manufacturing systems with contract net
    Hsieh, Fu-Shiung
    AUTOMATICA, 2008, 44 (04) : 959 - 970
  • [3] Contract-net based scheduling for holonic manufacturing systems
    Kanchanasevee, P
    Biswas, G
    Kawamura, K
    Tamura, S
    ARCHITECTURES, NETWORKS, AND INTELLIGENT SYSTEMS FOR MANUFACTURING INTEGRATION, 1997, 3203 : 108 - 115
  • [4] Multi level contract net protocol based on holonic manufacturing system implement to industrial networks
    Suesut, T
    Tipsuwanporn, V
    Nilas, P
    Rerngreun, P
    Numsomran, A
    2004 IEEE CONFERENCE ON ROBOTICS, AUTOMATION AND MECHATRONICS, VOLS 1 AND 2, 2004, : 253 - 258
  • [5] Holonic coordination obtained by joining the contract net protocol with constraint satisfaction
    Panescu, Doru
    Pascal, Carlos
    COMPUTERS IN INDUSTRY, 2016, 81 : 36 - 46
  • [6] Integrated process planning and scheduling in holonic manufacturing systems
    Sugimura, N
    Hino, R
    Moriwaki, T
    PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2001): ASSEMBLY AND DISASSEMBLY IN THE TWENTY-FIRST CENTURY, 2001, : 250 - 255
  • [7] An Extended Contract Net Protocol with Direct Negotiation of Managers
    Panescu, Doru
    Pascal, Carlos
    SERVICE ORIENTATION IN HOLONIC AND MULTI-AGENT MANUFACTURING AND ROBOTICS, 2014, 544 : 81 - 95
  • [8] An Extended the Contract Net Protocol Based on the Personal Assistant
    Fan, Gaojun
    Huang, Hongbing
    Jin, Shiyao
    2008 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL 2, PROCEEDINGS, 2008, : 603 - 607
  • [9] Multi-contract net protocol for dynamic scheduling in flexible manufacturing systems (FMS)
    Ouelhadj, D.
    Hanachi, C.
    Bouzouia, B.
    Moualek, A.
    Farhi, A.
    Proceedings - IEEE International Conference on Robotics and Automation, 1999, 2 : 1114 - 1119
  • [10] A multi-contract net protocol for dynamic scheduling in flexible manufacturing systems (FMS)
    Ouelhadj, D
    Hanachi, C
    Bouzouia, B
    Moualek, A
    Farhi, A
    ICRA '99: IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, PROCEEDINGS, 1999, : 1114 - 1119