Joint operation of wind farm, photovoltaic, pump-storage and energy storage devices in energy and reserve markets

被引:100
作者
Parastegari, Moein [1 ]
Hooshmand, Rahmat-Allah [1 ]
Khodabakhshian, Amin [1 ]
Zare, Amir-Hossein [1 ]
机构
[1] Univ Isfahan, Dept Elect Engn, Esfahan, Iran
关键词
Wind farm; Pump-storage power plant; Photovoltaic resources; Energy storage devices; Optimal bidding strategy; Energy and ancillary service markets; OPTIMAL-DESIGN; POWER; OPTIMIZATION; GENERATION; DISPATCH; STRATEGY; SYSTEM; UNITS;
D O I
10.1016/j.ijepes.2014.06.074
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Renewable resources generation scheduling is one of the newest problems of the power markets. In this paper, joint operation (JO) of wind farms (WF), pump-storage units (PSU), photo-voltaic (PV) resources, and energy storage devices (ESD) is studied in the energy and ancillary service markets. There are uncertainties in wind power generation (WPG), photovoltaic power generation (PVPG) and the market prices. To model these uncertainties, the WPG is forecasted by using ARMA model and its scenarios are generated using Weibull distribution function. Moreover, other uncertain parameters are forecasted first, and their uncertainties are modeled by using scenario generation and scenario reduction method. The proposed JO method is used to determine the optimal bidding strategy of the PSU, PV, ESD and WF of IEEE 118-bus standard system. The results for these renewable energy resources confirm that the JO of these resources increases the profit and decreases the risk of the resources in comparison with their uncoordinated operation (UO). (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:275 / 284
页数:10
相关论文
共 30 条
[11]   Battery capacity determination with respect to optimized energy dispatch schedule in grid-connected photovoltaic (PV) systems [J].
Gitizadeh, Mohsen ;
Fakharzadegan, Hamid .
ENERGY, 2014, 65 :665-674
[12]  
Hashim Haslenda, 2014, ENERGY
[13]   Optimal offering strategy considering the risk management for wind power producers in electricity market [J].
Hosseini-Firouz, Mansour .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 49 :359-368
[14]   Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer [J].
Jaramillo Duque, Alvaro ;
Castronuovo, Edgardo D. ;
Sanchez, Ismael ;
Usaola, Julio .
ELECTRIC POWER SYSTEMS RESEARCH, 2011, 81 (09) :1767-1777
[15]  
Jiaqi Liang, 2011, IEEE Transactions on Sustainable Energy, V2, P340, DOI 10.1109/TSTE.2011.2111468
[16]   Optimal design of a reliable hydrogen-based stand-alone wind/PV generating system, considering component outages [J].
Kaviani, A. Kashefi ;
Riahy, G. H. ;
Kouhsari, S. H. M. .
RENEWABLE ENERGY, 2009, 34 (11) :2380-2390
[17]   Risk-constrained bidding strategy with stochastic unit commitment [J].
Li, Tao ;
Shahidehpour, Mohammad ;
Li, Zuyi .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (01) :449-458
[18]   Combining hydro-generation and wind energy Biddings and operation on electricity spot markets [J].
Marquez Angarita, Jorge ;
Garcia Usaola, Julio .
ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (5-6) :393-400
[19]   Estimation of wind speed profile using adaptive neuro-fuzzy inference system (ANFIS) [J].
Mohandes, M. ;
Rehman, S. ;
Rahman, S. M. .
APPLIED ENERGY, 2011, 88 (11) :4024-4032
[20]   A methodology to generate statistically dependent wind speed scenarios [J].
Morales, J. M. ;
Minguez, R. ;
Conejo, A. J. .
APPLIED ENERGY, 2010, 87 (03) :843-855