Based on the System Dynamics construction phase of the project cost control Study

被引:1
|
作者
Yan, Wen Zhou [1 ]
Chen, Peng [1 ]
机构
[1] Xian Univ Architecture & Technol, Xian 710055, Shanxi, Peoples R China
来源
ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4 | 2014年 / 501-504卷
关键词
Construction Phase; Cost Control; System Dynamics;
D O I
10.4028/www.scientific.net/AMM.501-504.2691
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional method of project cost control management by objectives based, is a passive ex post control, and system dynamics model through the establishment of a strategic-level description of the project, emphasizing the active control of project costs, focused on the complexity of factors that are difficult to accurately quantify analysis is an important complement to traditional methods. Construction phase of the project cost control of construction project management is one of the main construction phase of the construction project in accordance with established cost control feedback effect diagram, analyze the main factors affecting cost control, qualitative analysis of the impact of the construction phase of the project cost control various factors and cost control effect brought. Proven system dynamics approach applied in the construction phase of the project feasibility.
引用
收藏
页码:2691 / 2694
页数:4
相关论文
共 50 条
  • [1] Study on Construction Project Cost Control Based on Lean Construction Thought
    Liu, Anning
    Ren, Xingzhen
    Xu, Yihao
    Chen, Xuefeng
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND INFORMATION TECHNOLOGY, 2015, 35 : 257 - 261
  • [2] Cost Control System Building Based on Government Investment Construction Project
    Wu, Zhen-quan
    Liu, Fang
    Xu, Xiao-yun
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: INNOVATION AND PRACTICE IN INDUSTRIAL ENGINEERING AND MANAGEMENT (VOL 2), 2016, : 695 - 705
  • [3] Study on Project Cost Control of Chinese Construction Enterprises
    Wang Hongmei
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1089 - 1092
  • [4] Construction Project Cost Control Based on Bayesian Network
    Mo, Junwen
    Yang, Shaohua
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 32 - 36
  • [5] System Dynamics-based Project Cost Risk Accession Control Modeling
    Dong Jun
    Li Rong
    Wang Dongxue
    2018 EIGHTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC 2018), 2018, : 81 - 86
  • [6] Simulation study of inventory cost control based on system dynamics
    Wang Y.
    Zhao J.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [7] Research on Dynamic Cost Control of Construction Project Based on BIM
    Wang, Yaxi
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 167 - 171
  • [8] Research on construction project cost budget and cost control based on matrix model
    Yang J.
    Li Z.
    Yang G.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [9] Cost Control Application Research of Value Engineering in the Design Phase of Construction Project
    Li Ning
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 390 - 396
  • [10] Study on Cost Control of Railway Construction Project Based on Hall Three-Dimensional Structure
    Lou, Lixing
    Yin, Yilin
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1793 - 1797