Economy and Design of Augered Cast-In-Place Piles at the Fargo WTP

被引:0
|
作者
Huff, Jonathan [1 ]
Bryson, L. Sebastian [2 ]
Giraldo, Jorge Romana [2 ]
机构
[1] Richard Goettle Inc, 12071 Hamilton Ave, Cincinnati, OH 45231 USA
[2] Univ Kentucky, Dept Civil Engn, 161 Raymond Bldg, Lexington, KY 40506 USA
来源
IFCEE 2018: CASE HISTORIES AND LESSONS LEARNED | 2018年 / 298期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Fargo water treatment plant improvement project is a $104 million plant addition located in Fargo, ND. The original foundation design for the addition consisted of 346 each 42-in. diameter drilled piers; similar to the existing plant foundations. A value engineering (VE) alternate foundation system was proposed that consisted of a 1-for-1 replacement of the drilled piers with auger cast-in place (ACIP) piles of equivalent capacity. The VE alternate proposal saved approximately $4 million and 15 weeks in the construction schedule. The ACIP pile VE alternate was ultimately selected for the project. A pile load testing program was undertaken to verify design assumptions and optimize the design of the piles by determining the frictional resistance being developed along the length of the test pile within each subsurface layer. The load testing program consisted of four reaction piles, and one sacrificial compression load test pile that was tested to a maximum test load of 704 kips. The pile load test was successful in verifying design assumptions, and verifying that the proposed ACIP pile was an appropriate deep foundation element for the project.
引用
收藏
页码:1 / 12
页数:12
相关论文
共 50 条
  • [1] Installation of augered cast-in-place piles
    Brettmann, T
    AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 47 - 54
  • [2] Quality control for installation of augered cast-in-place piles
    Arland, FJ
    AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 55 - 68
  • [3] Earth retention using augered cast-in-place piles
    Heckman, WS
    Goettle, R
    AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 95 - 99
  • [4] Reliability-Based Design of Augered Cast-in-Place Piles in Granular Soils
    Stuedlein, Armin W.
    Neely, William J.
    Gurtowski, Thomas M.
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2012, 138 (06) : 709 - 717
  • [5] Augered Cast-In-Place Piles Embedded in Cobbles and Boulders in Honolulu
    Hignite, Andrew J.
    Lim, Robin M.
    IFCEE 2018: CASE HISTORIES AND LESSONS LEARNED, 2018, (298): : 13 - 24
  • [6] Practical experience with nondestructive testing of augered cast-in-place piles
    Hertlein, BH
    Baker, CN
    AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 75 - 93
  • [7] Design of augered cast in place (ACIP) piles
    McVay, M
    Armaghani, B
    AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 21 - 45
  • [8] Reduced impact on adjacent structures using augered cast-in-place piles
    Lacy, Hugh S.
    Moskowitz, Joel
    Merjan, Stanley
    Transportation Research Record, 1994, (1447) : 19 - 26
  • [9] Predicting displacement of augered cast-in-place piles based on load test database
    Ching, Jianye
    Chen, Jie-Ru
    STRUCTURAL SAFETY, 2010, 32 (06) : 372 - 383
  • [10] Serviceability limit state reliability-based design of augered cast-in-place piles in granular soils
    Reddy, Seth C.
    Stuedlein, Armin W.
    CANADIAN GEOTECHNICAL JOURNAL, 2017, 54 (12) : 1704 - 1715