Simultaneous Production Scheduling and Waste Management Optimization for an Oil Sands Application

被引:19
作者
Ben-Awuah, E. [1 ]
Elkington, T. [1 ]
Askari-Nasab, H. [2 ]
Blanchfield, F. [1 ]
机构
[1] Snowden Min Ind Consultants, 87 Colin St, Perth, WA 6005, Australia
[2] Univ Alberta, Sch Min & Petr Engn, Edmonton, AB T6G 2W2, Canada
关键词
continuous backfilling; dyke construction; mine planning; mixed integer linear programming; oil sands mining; production scheduling; waste management optimization;
D O I
10.3808/jei.201500305
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Mine planning for oil sands involves the integration of waste management into the long term production planning process. This ensures that while ore is provided for the processing plant, sufficient in-pit tailings containment areas are made available as dedicated disposal areas for backfilling. This enables the creation of a trafficable landscape at the earliest opportunity to facilitate progressive reclamation. Apart from being a regulatory requirement, this integration impacts directly on the profitability and sustainability of oil sands mining operations. This paper introduces a mixed integer linear programming mine planning framework that seeks to simultaneously determine the production schedule, dyke construction schedule and the backfilling schedule. Different waste management strategies were also investigated. The model generated a practical, smooth and uniform schedule for ore, dyke material and backfilling activities. The results show that for the case studies considered, increasing the number of in-pit tailings cells reduces the net present value of the mine as a result of a reduced operational flexibility. However, this strategy makes in-pit tailings storage areas available earlier in the mine life, and ensures an efficient use of in-pit storage areas required for sustainable operations.
引用
收藏
页码:80 / 90
页数:11
相关论文
共 24 条
[1]  
[Anonymous], 1999, P 28 INT S APPL COMP
[2]   Mixed integer linear programming formulations for open pit production scheduling [J].
Askari-Nasab H. ;
Pourrahimian Y. ;
Ben-Awuah E. ;
Kalantari S. .
Journal of Mining Science, 2011, 47 (3) :338-359
[3]  
Askari-Nasab Hooman, 2010, International Journal of Mining and Mineral Engineering, V2, P185, DOI 10.1504/IJMME.2010.037624
[4]  
Askari-Nasab H., 2011, P 35 INT S APPL COMP, P329
[5]   Incorporating waste management into oil sands long term production planning [J].
Ben-Awuah, E. ;
Askari-Nasab, H. .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2013, 122 (01) :33-45
[6]   Production Scheduling and Waste Disposal Planning for Oil Sands Mining Using Goal Programming [J].
Ben-Awuah, E. ;
Askari-Nasab, H. ;
Awuah-Offei, K. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2012, 20 (01) :20-33
[7]  
Ben-Awuah E., 2013, THESIS U ALBERTA EDM
[8]   Oil sands mine planning and waste management using mixed integer goal programming [J].
Ben-Awuah, Eugene ;
Askari-Nasab, Hooman .
INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2011, 25 (03) :226-247
[9]   An application of Branch and Cut to open pit mine scheduling [J].
Caccetta, L ;
Hill, SP .
JOURNAL OF GLOBAL OPTIMIZATION, 2003, 27 (2-3) :349-365
[10]  
Chanda E.K. C., 1995, International Journal of Mining, Reclamation and Environment, V9, P203, DOI DOI 10.1080/09208119508964748