Scheduling algorithms for flexible manufacturing systems with partially grouped machines

被引:25
作者
Lee, DH [1 ]
Kim, YD
机构
[1] Swiss Fed Inst Technol, Dept Engn Mech, CH-1015 Lausanne, Switzerland
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
关键词
flexible manufacturing systems; loading and scheduling; partial grouping;
D O I
10.1016/S0278-6125(00)86632-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on a scheduling problem in a flexible manufacturing system. Unlike most previous studies, this paper deals with the scheduling problem resulting from a loading plan obtained for the configuration of the partial machine grouping, where machines are tooled differently, but multiple machines can be assigned to each operation. The planned workload of each machine specified by the loading plan may or may not be maintained when scheduling and controlling part flows. In this paper, two solution algorithms in which a given planned workload is maintained are suggested based on decomposition of the entire problem into route selection and job shop scheduling problems. In one algorithm, the two subproblems are solved simultaneously by employing rules for part selection and machine selection, while in the other they are solved using a simulated annealing algorithm and dispatching rules. Performance of the suggested algorithms is tested on randomly generated test problems, and results show that the latter algorithms give better solutions and solve the problems in a reasonable amount of computation time. Also, it is shown from computational experiments that it is better to maintain planned workloads.
引用
收藏
页码:301 / 309
页数:9
相关论文
共 26 条
[1]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[2]   A BOTTLENECK-BASED BEAM SEARCH FOR JOB SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM [J].
CHANG, YL ;
MATSUO, H ;
SULLIVAN, RS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (11) :1949-1961
[3]   EXPERIMENTAL INVESTIGATION OF FLEXIBLE MANUFACTURING SYSTEM SCHEDULING DECISION RULES [J].
DENZLER, DR ;
BOE, WJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (07) :979-994
[4]   TIME COMPLETION FOR VARIOUS DISPATCHING RULES IN JOB SHOPS [J].
ELVERS, DA ;
TAUBE, LR .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1983, 11 (01) :81-89
[5]  
Ishii N., 1994, International Journal of Flexible Manufacturing Systems, V6, P69, DOI 10.1007/BF01324876
[6]   Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process [J].
Kim, YD ;
Lim, HG ;
Park, MW .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (01) :124-143
[7]  
KIM YD, 1987, INT J PROD RES, V25, P1751
[8]   A STUDY ON SURROGATE OBJECTIVES FOR LOADING A CERTAIN TYPE OF FLEXIBLE MANUFACTURING SYSTEMS [J].
KIM, YD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (02) :381-392
[9]   A COMPARISON OF DISPATCHING RULES FOR JOB SHOPS WITH MULTIPLE IDENTICAL JOBS AND ALTERNATIVE ROUTEINGS [J].
KIM, YD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (05) :953-962
[10]   Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems [J].
Kim, YD ;
Yano, CA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (12) :3303-3322