Proposal and Application of a Methodology to Improve the Control and Monitoring of Complex Hydroelectric Power Station Construction Projects

被引:8
|
作者
Urgiles, Paul [1 ]
Sebastian, Miguel A. [2 ]
Claver, Juan [2 ]
机构
[1] Strateg Publ Co Elect Corp Ecuador CELEC EP, Projects Submanagement Dept, Panamer Norte Km 7-5, Cuenca 010162, Ecuador
[2] Univ Nacl Educ Distancia UNED, Dept Construct & Mfg Engn, C Juan del Rosal 12, Madrid 28040, Spain
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 21期
关键词
complex project; control and monitoring projects; EVM; hydroelectric plant; project management; EARNED VALUE MANAGEMENT; DAMS;
D O I
10.3390/app10217913
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
All complex projects take place in environments of great uncertainty. Maintaining a monitoring and control system from the early stages of execution is a critical factor in the success of this type of project. Large hydroelectric power station construction projects are regarded as highly complex because they are affected by factors such as the risks inherent in a variety of fields of engineering, geology and the environment, the long execution times, and the large number of multidisciplinary activities to be carried out in parallel, among others. These types of projects are commonly affected by cost overruns and delays. This work develops a methodology for the monitoring and control of complex construction projects in the hydroelectric sector that enables a periodical calculation of metrics for physical progress, financial progress, and predictions for costs and durations on completion of the project. The verification of the efficiency of this methodology was based on stochastic simulation models applied to real projects in the hydropower sector. The results showed that the proposed methodology improved efficiency compared with existing traditional methodologies. The proposed methodology allows the simultaneous consideration of costs, deadlines, criticality, and risks of the activities of the analyzed projects and also incorporates multicriteria decision techniques to manage the influence of key aspects during the development of the project.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 50 条
  • [1] Seismometric Monitoring of Toktogul Hydroelectric Power Station
    Dovgan, Vladimir
    2012 IV INTERNATIONAL CONFERENCE PROBLEMS OF CYBERNETICS AND INFORMATICS (PCI), 2012,
  • [2] Application of explosion for reconstruction of hydroelectric power station
    Benderskij, L.F.
    Evlikov, A.A.
    Stupel', R.O.
    Braginskij, G.S.
    Solov'ev, V.V.
    Okhrimenko, V.V.
    Gidrotekhnicheskoe Stroitel'stvo, 1994, (07): : 30 - 32
  • [3] Recovery of nativa area used for construction of hydroelectric power station
    Alves, Marlene C.
    do Nascimento, Vagner
    de Souza, Zigomar M.
    REVISTA BRASILEIRA DE ENGENHARIA AGRICOLA E AMBIENTAL, 2012, 16 (08): : 887 - 893
  • [4] APPLICATION OF CONSTRUCTION SCHEDULE FOR MONITORING AND CONTROL OF CIVIL ENGENEERING PROJECTS
    Danijela, Stanojlovic
    ARCHIVES FOR TECHNICAL SCIENCES, 2015, (12): : 51 - 58
  • [5] Geodetic Monitoring of Large-Span Underground Facilities During Construction of the Rogun Hydroelectric Power Station
    Nazirov J.A.
    Davlatshoev S.K.
    Kozlov D.V.
    Power Technology and Engineering, 2018, 52 (4) : 400 - 404
  • [6] MIMO generalized predictive control for a hydroelectric power station
    Munoz-Hernandez, German Ardul
    Jones, Dewi
    IEEE TRANSACTIONS ON ENERGY CONVERSION, 2006, 21 (04) : 921 - 929
  • [7] Motivation for the participation of Soviet youth in Komsomol construction projects during the Khrushchev Thaw (on the example of the Krasnoyarsk Hydroelectric Power Station)
    Kasamara, Valeria A.
    Chebanova, Dania S.
    TOMSK STATE UNIVERSITY JOURNAL, 2022, (477): : 85 - 94
  • [8] Multiobjective feedback control and its application to the construction of control rules for a cascade of hydroelectric power stations
    Lotov, A. V.
    Ryabikov, A. I.
    TRUDY INSTITUTA MATEMATIKI I MEKHANIKI URO RAN, 2014, 20 (04): : 187 - 203
  • [9] Methodology for construction compliance monitoring in the crediting of investment projects for road construction
    Vaynshtok, Natalia
    ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [10] Construction of small hydroelectric power station on Aara river in Switzerland has begun
    Anon
    Gidrotekhnicheskoe Stroitel'stvo, 1994, (12):