Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership

被引:28
作者
Le, Phuoc Luong [1 ,2 ]
Jarroudi, Imen [1 ]
Dao, Thien-My [1 ]
Chaabane, Amin [1 ]
机构
[1] Univ Quebec, Ecole Technol Super ETS, Montreal, PQ, Canada
[2] Ho Chi Minh City Univ Technol, VNU HCM, Sch Ind Management, Dept Prod & Operat Management, Ho Chi Minh City, Vietnam
关键词
Supply chain management; logistics; decision-making; optimisation; integration; SELECTION; INDUSTRY; PROJECTS; SITE; BIM;
D O I
10.1080/01446193.2020.1831037
中图分类号
F [经济];
学科分类号
02 ;
摘要
Studies have confirmed the benefits of using Third-party logistics (TPL) for efficient construction management, especially in large projects. Nevertheless, there is a dearth of decision-making models evaluating the exact role of TPL providers as drivers for supply chain (SC) integration and optimisation. This study aims to develop a decision-making model for construction supply chain (CSC) optimisation, with possible TPL integration. The proposed model considers two types of purchased materials (type-1 and type-2) and assists the main contractor in determining construction supply chain management (CSCM) strategies, including supplier selection, order quantity determination, and TPL use evaluation. Using the model, the main contractor can take advantage of the TPL provider's warehouse and order larger quantities, if necessary, to obtain lower prices offered by suppliers. Through case examples in Canada, we find that the proposed model performs better in optimising total SC cost, as compared to the model without TPL. Model validations also show that TPL can be conditionally used to improve construction logistics performance and to meet practical requirements targeting issues in the construction industry.
引用
收藏
页码:133 / 155
页数:23
相关论文
共 41 条
[1]   Supplier selection and order lot sizing modeling: A review [J].
Aissaoui, Najla ;
Haouari, Mohamed ;
Hassini, Elkafi .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (12) :3516-3540
[2]  
Aretoulis G N., 2010, Operational Research, V10, P209, DOI DOI 10.1007/S12351-009-0065-3
[3]   Taking Stock of Temporary Organizational Forms: A Systematic Review and Research Agenda [J].
Bakker, Rene M. .
INTERNATIONAL JOURNAL OF MANAGEMENT REVIEWS, 2010, 12 (04) :466-486
[4]   Interdependence in supply chains and projects in construction [J].
Bankvall, Lars ;
Bygballe, Lena E. ;
Dubois, Anna ;
Jahre, Marianne .
SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2010, 15 (05) :385-393
[5]   Coordinated construction logistics: an innovation perspective [J].
Bengtsson, Susanna Hedborg .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2019, 37 (05) :294-307
[6]  
Choudhari S, 2017, CONSTR INNOV-ENGL, V17, P158, DOI 10.1108/CI-03-2016-0014
[7]  
Dainty A., 2006, COMMUNICATION CONSTR
[8]  
Dainty A.R. J., 2001, INT J, V6, P163
[9]   Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review [J].
Dallasega, Patrick ;
Rauch, Erwin ;
Linder, Christian .
COMPUTERS IN INDUSTRY, 2018, 99 :205-225
[10]   Integrating 4D BIM and GIS for Construction Supply Chain Management [J].
Deng, Yichuan ;
Gan, Vincent J. L. ;
Das, Moumita ;
Cheng, Jack C. P. ;
Anumba, Chimay .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)