Coordinating a Service Supply Chain under Arms Offset Program's Intervention by Performance-Based Contracting

被引:3
作者
Lin, Yi-Kuei [1 ]
Lin, Jong-Jang [1 ]
Yeh, Ruey-Huei [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 10607, Taiwan
关键词
MAINTENANCE; RELIABILITY; MODEL; COOPERATION; INCENTIVES; PRODUCTS;
D O I
10.1155/2016/8590371
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates a support service supply chain for coordinating with a local third-party logistics provider by arms offset program's intervention and develops a performance-based contracting framework for the coordinating problem, which remains scarce in the literatures. The performance-based contracting framework evaluates payments and profits for the support service by a game-theoretical approach with principal-agent model. We prove that the proposed framework is an effective tool in acquiring the balance between maximum profit and minimum payment for both parties in the coordinating problem without moral hazard issue. A numerical study consolidates the formulated schemes as contracting preference for both parties' decision with a higher profit margin at a lower customer's payment.
引用
收藏
页数:10
相关论文
共 28 条
[1]   Service contracts: A stochastic model [J].
Ashgarizadeh, E ;
Murthy, DNP .
MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (10-12) :11-20
[2]   Pricing and managing a maintenance contract for a fleet of aircraft engines [J].
Bowman, RA ;
Schmee, J .
SIMULATION, 2001, 76 (02) :69-77
[3]   Salesforce incentives, market information, and production/inventory planning [J].
Chen, FR .
MANAGEMENT SCIENCE, 2005, 51 (01) :60-75
[4]  
Chiang A., 2005, Fundamental Methods of Mathematical Economics
[5]   Supply Chain Coordination for Fixed Lifetime Products with Permissible Delay in Payments [J].
Duan, Yongrui ;
Li, Guiping ;
Huo, Jiazhen .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
[6]   Applying hybrid case-based reasoning in agent-based negotiations for supply chain management [J].
Fang, Fang ;
Wong, T. N. .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (12) :8322-8332
[7]   Planning performance based contracts considering reliability and uncertain system usage [J].
Jin, T. ;
Wang, P. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (10) :1467-1478
[8]   A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting [J].
Jin, Tongdan ;
Tian, Zhigang ;
Xie, Min .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 161 :31-43
[9]   Performance contracting in after-sales service supply chains [J].
Kim, Sang-Hyun ;
Cohen, Morris A. ;
Netessine, Serguei .
MANAGEMENT SCIENCE, 2007, 53 (12) :1843-1858
[10]   Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems [J].
Kim, Sang-Hyun ;
Cohen, Morris A. ;
Netessine, Serguei ;
Veeraraghavan, Senthil .
MANAGEMENT SCIENCE, 2010, 56 (09) :1551-1567