Research on Thermal Stress of Subway Tunnel in Construction Period

被引:2
|
作者
Zhao, Xinming [1 ]
Zhang, Xiaoyao [1 ]
Wang, Jiankui [1 ]
Hu, Shaowei [2 ]
Lu, Jun [2 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Dept Civil Engn, Nanjing 210016, Jiangsu, Peoples R China
[2] Nanjing Hydraulic Res Inst, Nanjing 210003, Peoples R China
来源
CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2 | 2013年 / 438-439卷
关键词
subway tunnel; concrete; construction period; thermal stress;
D O I
10.4028/www.scientific.net/AMM.438-439.996
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article calculates the thermal fields and thermal stress fields of the subway tunnel concrete during construction using finite element software ABAQUS. With the calculating laws of distribution of the two fields mentioned above, this paper provides several suggestions for designing and constructing of subway tunnel.
引用
收藏
页码:996 / +
页数:2
相关论文
共 50 条
  • [1] Research on mechanical behavior of construction in transforming the existing tunnel into subway
    Duan, Bao-Fu
    Wu, Sheng-Zhi
    Zhu, Ying-Lei
    Song, Le-Chun
    Li, Huan-Zhen
    Journal of Railway Engineering Society, 2014, 31 (01) : 95 - 100
  • [2] RESEARCH ON INJECTED REINFORCEMENT CONTROL TECHNIQUE OF NONSATURATION SOIL BODY SETTLEMENT ANAMORPHOSIS IN SUBWAY TUNNEL CONSTRUCTION PERIOD
    Xie, Jinshui
    Bai, Mingzhou
    Xu, Zhaoyi
    Liu, Lihua
    Wang, Pengcheng
    Yang, Yinjing
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 523 - 527
  • [3] Research on key construction technology of shield tunnel grouting in a Beijing subway project
    1600, CAFET INNOVA Technical Society, 1-2-18/103, Mohini Mansion, Gagan Mahal Road,, Domalguda, Hyderabad, 500029, India (09):
  • [4] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [5] Forensic Investigation of A Subway Tunnel Construction Failure
    Lee, W. F.
    Wang, C. C.
    Ishihara, K.
    Hwang, R. N.
    GEOTECHNICAL ENGINEERING, 2016, 47 (02): : 50 - 59
  • [6] Grouting effect on the settlement of subway tunnel construction
    Wang, Xiao-Wei
    Liu, Tao
    Wang, Er-Jue
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 2): : 402 - 405
  • [7] Concrete thermal stress analysis during tunnel construction
    Wang, Xianfeng
    Chen, Qi
    Tao, Jun
    Han, Rui
    Ding, Xiaobo
    Xing, Feng
    Han, Ningxu
    ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (06)
  • [8] Impact of subway shield tunnel construction on deformation of existing utility tunnel
    Wei, Shi
    Zenglin, Hong
    Min, Yang
    Ning, Li
    Tianxiang, Tan
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [9] Limit analysis of a shallow subway tunnel with staged construction
    Yu, Shengbing
    GEOMECHANICS AND ENGINEERING, 2018, 15 (05) : 1039 - 1046
  • [10] Research on Coupling Degree Model of Safety Risk System for Tunnel Construction in Subway Shield Zone
    Pan, Haize
    Gou, Jing
    Wan, Zihong
    Ren, Chuxuan
    Chen, Mengjie
    Gou, Tangqiao
    Luo, Zhenhua
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019