Sensitivity-analysis based method in single-robot cells cost-effective design and optimization

被引:15
作者
Zhang, Jiafan [1 ,2 ]
Fang, Xinyu [1 ]
Qi, Liwei [1 ]
机构
[1] ABB Corp Res China, Shanghai 201319, Peoples R China
[2] Zhejiang Univ, State Key Lab Ind Control & Technol, Hangzhou 310027, Zhejiang, Peoples R China
关键词
Robotic cell; Productivity; Sensitivity-analysis; Cost-effective design; SCHEDULING PROBLEMS; PARALLEL MACHINES; FLEXIBILITY; CONSTRAINTS; THROUGHPUT; TIMES;
D O I
10.1016/j.rcim.2015.09.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Robot-centered cells play increasingly important roles in corporate automation and repetitive processing to improve productivity and quality. How to provide an optimal robotic cell design either from cost-effectiveness or from productivity enhancement is a highlighted objective, especially in 3C industry of communication, computer and consumer electronics where the cost is always sensitive. Although, in the past years, several optimizing solutions have been achieved, the robotic cell optimization is still an open question both in industry and academia, due to the diversities of cell patterns determined by some main factors as single/dual gripper, simple/parallel workstation, and so on. This work targets the optimization design of a single-robot cell from cost-effective viewpoint, by means of the sensitivity analysis, performed in terms of the processing time, the traveling time and the gripper configuration. It provides an indication on the relationship between the cell productivity and the main factors. By comparing the resulting increase in revenue with the additional equipment costs, it intuitively provides the optimal solution by considering the gripper type, and whether or how many parallel workstations are needed. A demonstration to enhance the productivity of a single-robotic cell from real-life engineering scenario is performed with an encouraging result. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:9 / 15
页数:7
相关论文
共 24 条
[1]   Robotic cell scheduling with operational flexibility [J].
Akturk, MS ;
Gultekin, H ;
Karasan, OE .
DISCRETE APPLIED MATHEMATICS, 2005, 145 (03) :334-348
[2]   Cyclic scheduling of a hoist with time window constraints [J].
Chen, HX ;
Chu, CB ;
Proth, JM .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (01) :144-152
[3]  
Dassault, 2003, U.S. Patent, Patent No. 6526373
[4]   Sequencing and scheduling in robotic cells: Recent developments [J].
Dawande, M ;
Geismar, HN ;
Sethi, SP ;
Sriskandarajah, C .
JOURNAL OF SCHEDULING, 2005, 8 (05) :387-426
[5]  
Dawande MW, 2007, INT SER OPER RES MAN, V101, P1, DOI 10.1007/0-387-70988-6
[6]   Increasing throughput for robotic cells with parallel machines and multiple robots [J].
Geismar, HN ;
Sriskandarajah, C ;
Ramanan, N .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2004, 1 (01) :84-89
[7]   Robotic cells with parallel machines: Throughput maximization in constant travel-time cells [J].
Geismar, HN ;
Dawande, M ;
Sriskandarajah, C .
JOURNAL OF SCHEDULING, 2004, 7 (05) :375-395
[8]   Bicriteria robotic cell scheduling [J].
Gultekin, Hakan ;
Akturk, M. Selim ;
Karasan, Oya Ekin .
JOURNAL OF SCHEDULING, 2008, 11 (06) :457-473
[9]   Scheduling in robotic cells: process flexibility and cell layout [J].
Gultekin, Hakan ;
Akturk, M. Selim ;
Karasan, Oya Ekin .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (08) :2105-2121
[10]   Cyclic scheduling of a 2-machine robotic cell with tooling constraints [J].
Gultekin, Hakan ;
Akturk, M. Selim ;
Karasan, Oya Ekin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (02) :777-796