Group scheduling and job-dependent due window assignment based on a common flow allowance

被引:35
作者
Ji, Min [1 ]
Chen, Ke [1 ]
Ge, Jiaojiao [1 ]
Cheng, T. C. E. [2 ]
机构
[1] Zhejiang Gongshang Univ, Sch Comp Sci & Informat Engn, Contemporary Business & Trade Res Ctr, Hangzhou 310018, Zhejiang, Peoples R China
[2] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
关键词
Single-machine scheduling; Group technology; Common flow allowance; Job-dependent due window; Earliness/tardiness; DUE-DATE ASSIGNMENT; SINGLE-MACHINE; RESOURCE-ALLOCATION; PROCESSING TIMES; ENVIRONMENT; SETUP;
D O I
10.1016/j.cie.2013.11.017
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We study a single-machine group scheduling and job-dependent due window assignment problem in which each job is assigned an individual due window based on a common flow allowance. In the group technology environment, the jobs are divided into groups in advance according to their processing similarities and all the jobs of the same group are processed consecutively in order to improve production efficiency. A sequence-independent machine setup time precedes the processing of the first job of each group. A job completed earlier (later) than its due window will incur an earliness (tardiness) penalty. Our goal is to find the optimal sequence for both the groups and jobs, together with the optimal due window assignment, to minimize the total cost that comprises the earliness and tardiness penalties, and the due window starting time and due window size costs. We give an O(n logn)time algorithm to solve this problem. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:35 / 41
页数:7
相关论文
共 26 条
[1]  
Adamopoulos GI, 1996, J OPER RES SOC, V47, P1280, DOI 10.1057/jors.1996.155
[3]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[4]  
[Anonymous], 1967, INEQUALITIES
[5]   Single-machine group scheduling with general deterioration and learning effects [J].
Bai, Jing ;
Li, Zhi-Rong ;
Huang, Xue .
APPLIED MATHEMATICAL MODELLING, 2012, 36 (03) :1267-1274
[6]   Due windows group scheduling using an effective hybrid optimization approach [J].
Behnamian, J. ;
Zandieh, M. ;
Ghomi, S. M. T. Fatemi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8) :721-735
[7]   Single machine scheduling with common due date assignment in a group technology environment [J].
Chen, DW ;
Li, S ;
Tang, GC .
MATHEMATICAL AND COMPUTER MODELLING, 1997, 25 (03) :81-90
[8]   A note on scheduling a maintenance activity and due-window assignment based on common flow allowance [J].
Chen, Ke ;
Ji, Min ;
Ge, Jiaojiao .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (02) :645-646
[9]   Group sequencing around a common due date [J].
Cheng, T. C. Edwin ;
Kovalyov, Mikhail Y. ;
Ng, C. T. ;
Lam, S. S. .
DISCRETE OPTIMIZATION, 2008, 5 (03) :594-604
[10]   OPTIMAL SLACK DUE-DATE DETERMINATION AND SEQUENCING [J].
CHENG, TCE .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (04) :305-309