MULTI-OBJECT DECISION-MAKING ON PEAK SHAVING OF WEST-EAST GAS PIPELINE

被引:0
|
作者
Zuo, Lili [1 ]
Wu, Changchun [1 ]
Zheng, Hongwei
Zhang, Fukun
机构
[1] China Univ Petr, Beijing Key Lab Urban Oil & Gas Distribut Technol, Beijing, Peoples R China
关键词
Gas Pipeline; Peak Shaving; Transient Simulation; Scenario;
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This paper addresses the peak shaving of West-East Gas Pipeline. For a gas pipeline system, the decision-making on the peak shaving scenarios usually involves a delicate balance between low operation cost and high gas supply reliability. In order to select an acceptable peak shaving scenario from these two angles for West-East Gas Pipeline, the idea of multi-objective decision-making has been introduced. Based on design flow-rate, eight typical peak shaving scenarios have been evaluated, analyzed and optimized with the help of TGNET. During the simulation, in order to make the peak shaving process more approach to the actual operation of the pipeline system, 51 days of forecasted data are used to establish the system starting state for the study period. On the other hand, in order to reduce the effect of different peak shaving process to the subsequent operation, the study period is extended by 7 days to fully account for operating costs and conditions subsequent to the study period, which make different peak shaving scenarios comparable. According to multi-objective optimization criteria including operation cost, gas supply reliability and operation stability, different pareto peak shaving scenarios have been obtained. These scenarios show that from the object of minimizing operation cost, inlet pressure of Shanghai terminal should approach to contractual pressure, from the object of gas supply reliability and operation stability, inlet pressure of Shanghai terminal should maintain a higher value. Operators can adopt different peak shaving scenarios according to different optimization object. Furthermore, with mathematical statistics knowledge, control value of inlet pressure of Shanghai terminal is recommended. When the change of withdrawal flow-rate from underground gas storage is more frequent, the fluctuation of inlet flow-rate is smaller. When withdrawal flow-rate from underground natural gas storage increases, it will not only increase the inventory of whole pipeline and end segment, but also decrease the inlet flow-rate.
引用
收藏
页码:11 / 18
页数:8
相关论文
共 50 条
  • [31] A Reliability Assessment of the Hydrostatic Test of Pipeline with 0.8 Design Factor in the West-East China Natural Gas Pipeline III
    Wen, Kai
    He, Lei
    Yu, Weichao
    Gong, Jing
    ENERGIES, 2018, 11 (05)
  • [32] Research & Development of Grade X70 LSAW Steel Pipes for West-East Gas Pipeline
    Wang Xiaoxiang
    EngineeringSciences, 2004, (04) : 40 - 45
  • [33] Differences in shared decision-making: the East-West divide
    Chen, Weihua
    Zhang, Huangruowen
    Xu, Mingyue
    Huang, Rongchong
    BMJ EVIDENCE-BASED MEDICINE, 2024, 29 (05) : 289 - 291
  • [34] Information disclosure and decision-making: the Middle East versus the Far East and the West
    Mobeireek, A. F.
    Al-Kassimi, F.
    Al-Zahrani, K.
    Al-Shimemeri, A.
    al-Damegh, S.
    Al-Amoudi, O.
    Al-Eithan, S.
    Al-Ghamdi, B.
    Gamal-Eldin, M.
    JOURNAL OF MEDICAL ETHICS, 2008, 34 (04) : 225 - 229
  • [35] Safety requirements for the Second high-pressure and large-diameter West-East Gas Pipeline
    Zhuang Chuanjing
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2007, VOL 3: DESIGN AND ANALYSIS, 2007, : 473 - 480
  • [36] Multi-Object Trajectory Coupling Using Online Target Specific Decision Making
    Badal, Tapas
    Nain, Neeta
    Ahmed, Mushtaq
    2017 IEEE INTERNATIONAL CONFERENCE ON IDENTITY, SECURITY AND BEHAVIOR ANALYSIS (ISBA), 2017,
  • [37] Multi-objective transient peak shaving optimization of a gas pipeline system under demand uncertainty
    Chen, Qian
    Wu, Changchun
    Zuo, Lili
    Mehrtash, Mahdi
    Wang, Yixiu
    Bu, Yaran
    Sadiq, Rehan
    Cao, Yankai
    COMPUTERS & CHEMICAL ENGINEERING, 2021, 147
  • [38] PROGRAM PREFERENCE WITH MULTI-ATTRIBUTE DECISION-MAKING METHOD FOR OUTGOING PIPELINE ROUTING OF SHALE GAS
    Jin, C.
    Zhang, Z.
    La, R.
    SOCAR PROCEEDINGS, 2019, 2019 (02): : 59 - 65
  • [40] Online Multi-Object Tracking via Combining Discriminative Correlation Filters With Making Decision
    Wu, Chenglong
    Sun, Hao
    Wang, Hongqi
    Fu, Kun
    Xu, Guangluan
    Zhang, Wenkai
    Sun, Xian
    IEEE ACCESS, 2018, 6 : 43499 - 43512