A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff

被引:27
作者
Hajiagha, Seyed Hossein Razavi [1 ]
Mahdiraji, Hannan Amoozad [2 ]
Hashemi, Shide Sadat [3 ]
机构
[1] Inst Trade Studies & Res, Prod & Systemat Res & Studies Grp, Tehran, Iran
[2] Islamic Azad Univ, Kashan Branch, Kashan, Iran
[3] Allameh Tabatabaei Univ, Management & Accounting Fac, Tehran, Iran
关键词
Project management; Time; cost; and quality tradeoff; The iron triangle; Fuzzy goal programming; Grey numbers; DISCRETE-TIME; OFF ANALYSIS; OPTIMIZATION; MANAGEMENT;
D O I
10.1007/s00170-013-5463-2
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The purpose of this paper is to develop current mathematical models of cost, time, and quality tradeoffs in conditions that parameters of project activities are estimated uncertainly by grey numbers. In some projects like construction projects, activities can be done within a much shorter time by increasing in the resources, while project's cost may rise at the same time. In such situations, managers are usually required to determine the best combination of cost, time, and quality parameters of the activities, although their information regarding these parameters is limited and rather incomplete. The greyness of these parameters in the proposed method can aid managers to deal with these conditions. The most important aspect of the proposed model is that it considers uncertainty of the project planning data in the form of grey numbers. A combination of fuzzy goal programming and grey linear programming is also developed to solve the proposed model. Finally, this model will provide the managers with a stronger ability to face with uncertainty in project management and planning. The application of this model is examined in a numerical example. As its major finding, the model determines an optimal range in which the project managers can respond to intrinsic changes that may occur in the parameters during a project.
引用
收藏
页码:117 / 126
页数:10
相关论文
共 63 条
[1]   Time-cost trade-off problem in construction project management, based on fuzzy logic [J].
Abbasnia, R. ;
Afshar, A. ;
Eshtehardian, E. .
Journal of Applied Sciences, 2008, 8 (22) :4159-4165
[2]  
Afhsar A., 2007, ASIAN J CIVIL ENG, V8, P113
[3]  
Akkan C, 1998, WORKING PAPER
[4]   Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria [J].
Amiri, Maghsoud ;
Golozari, Farhaneh .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4) :393-401
[5]  
[Anonymous], 2008, GUID PROJ MAN BOD KN
[6]  
[Anonymous], ADV COMPUTERS
[7]  
[Anonymous], MACWORLD AUG
[8]  
Aoieong R.T., 2002, CONSTR MANAG ECON, V20, P179, DOI [10.1080/01446190110109157, DOI 10.1080/01446190110109157]
[9]   Project management with time, cost, and quality considerations [J].
Babu, AJG ;
Suresh, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :320-327
[10]  
Bouyssou D, 1989, IMPROVING DECISION M