BIM-based collaboration - a phase-oriented process concept for virtual design reviews

被引:1
作者
Baumgaertel, Lukas [1 ]
Schoenbach, Robin [1 ]
Hartung, Robert [1 ]
Ruwoldt, Alexander [1 ]
Klemt-Albert, Katharina [1 ]
机构
[1] Leibniz Univ Hannover, Inst Baumanagement & Digitales Bauen, Appelstr 9a, D-30167 Hannover, Germany
关键词
building information modeling; BIM; design review; meeting concept; virtual design review; VDR; communication; digital collaboration;
D O I
10.1002/bate.202000098
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
BIM-based collaboration - a phase-oriented process concept for virtual design reviews Object-based, digital 3-D building models are used as a central source of information for all project participants when Building Information Modeling is applied and are thus increasingly becoming the focus of meetings in construction projects. However, there are hardly any orientations or standards for the implementation of virtual design reviews, which concern clear process structures, role distributions as well as basic IT requirements for the rooms of digital meetings. The potentials of model-based collaboration through the introduction of BIM therefore often remain unused. The present article takes up the process conditions of the BIM methodology and influencing variables of meeting processes, describes the implementation of virtual design reviews in three real projects and, as a result of the analysis of these three scenarios, shows a phase-oriented innovative process concept for the integral preparation, realisation and post-processing of a virtual design review, including a clear distribution of roles as well as recommendations on requirements for data management, room equipment and IT.
引用
收藏
页码:817 / 825
页数:9
相关论文
共 50 条
  • [21] BIM-based environmental impact assessment for infrastructure design projects
    van Eldik, Maarten Albert
    Vahdatikhaki, Faridaddin
    dos Santos, Joao Miguel Oliveira
    Visser, Maarten
    Doree, Andre
    AUTOMATION IN CONSTRUCTION, 2020, 120
  • [22] A session-based collaboration environment for BIM-BASED Project Life-Cycle Management
    Chin, Sangyoon
    Yoon, Su-Won
    Shin, Tae-Hong
    Lee, Ghang
    Choi, Cheolho
    Kwon, Soon-Wook
    25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 745 - +
  • [23] Formulating the Application Functional Requirements of a BIM-based Collaboration Platform to Support IPD Projects
    Ma, Zhiliang
    Ma, Jiankun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (06) : 2011 - 2026
  • [24] Formulating the application functional requirements of a BIM-based collaboration platform to support IPD projects
    Zhiliang Ma
    Jiankun Ma
    KSCE Journal of Civil Engineering, 2017, 21 : 2011 - 2026
  • [25] BIM-based Clash Resolution Process Using Fuzzy AHP Methods
    Hasannejad, Ali
    Javid, Ali Akbar Shirzadi
    Bitaraf, Iman
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2023, 48 (3) : 1749 - 1762
  • [26] BIM-based iterative tool for sustainable building design: A conceptual framework
    Ahmad, Tayyab
    Aibinu, Ajibade
    Thaheem, Muhammad Jamaluddin
    INTERNATIONAL HIGH-PERFORMANCE BUILT ENVIRONMENT CONFERENCE - A SUSTAINABLE BUILT ENVIRONMENT CONFERENCE 2016 SERIES (SBE16), IHBE 2016, 2017, 180 : 782 - 792
  • [27] BIM-Based Parametric Design Methodology for Modernized Korean Traditional Buildings
    Park, Jungdae
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2011, 10 (02) : 327 - 334
  • [28] Current issues of BIM-based design change management, analysis and visualization
    Juszczyk, Michal
    Tomana, Andrzej
    Bartoszek, Maja
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 518 - 525
  • [29] BIM-based Integrated Design Software for the Steel Structure of Industrial Plant
    Chang, Zhiguo
    ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 1185 - 1188
  • [30] BIM-based model for quantifying the design change time ripple effect
    Moayeri, Valeh
    Moselhi, Osama
    Zhu, Zhenhua
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2017, 44 (08) : 626 - 642