Three-dimensional nonhydrostatic numerical simulation for the PBL of open-pit mine

被引:7
|
作者
Shi, Y
Feng, XS
Wei, FS
Jiang, WM
机构
[1] Chinese Acad Sci, Lab Numer Study Heliospher Phys, Beijing 100080, Peoples R China
[2] Nanjing Univ, Dept Atmospher Sci, Nanjing 210093, Peoples R China
关键词
nonhydrostatic model; open-pit mine; microscale concave terrain; numerical simulation; planetary boundary-layer; re-circulation;
D O I
10.1023/A:1002404106737
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
A high-resolution, nonhydrostatic, three-dimensional planetary boundary-layer (PBL) model was established considering the characteristic features of an open-pit mine, which is only (2 km x 2 km) wide and more than 100 m deep. The (E-epsilon) closure schemes was used in the model. Physical processes such as shortwave radiation of the sun and its uneven distribution on the ground, longwave radiation of earth-atmosphere systems, sensible heat and latent heat and heat flowing into the substrate of the earth, were involved in the model. Using this model PBL structures over this kind of microscale concave terrain (an open-pit mine) were fully studied and numerical experiments on the effects of parameters including H, depth of the mine, alpha, slope angle of the mine, u, incidcent airflow velocity, and P, indicating shear of the initial velocity, on the PBL were also made. Finally, the evolution process of the PBL was simulated. The results showed that a characteristic and major feature of the PBL is re-circulation, which is greatly influenced by the topography of the mine and the meteorolgical conditions therein. Thermal and mechanical forcing play different but important roles in the evolution process of the PBL.
引用
收藏
页码:197 / 224
页数:28
相关论文
共 50 条
  • [41] Open-Pit Mine Optimization with Maximum Satisfiability
    Matthew Deutsch
    Mining, Metallurgy & Exploration, 2019, 36 : 757 - 764
  • [42] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764
  • [43] CUTOFFS GRADE CALCULATION FOR THE OPEN-PIT MINE
    JOHN, T
    CIM BULLETIN, 1984, 77 (863): : 91 - 91
  • [44] SLOPE DESIGN OF AN OPEN-PIT COPPER MINE
    SINGH, VK
    BALIGA, BD
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1994, 31 (01) : 55 - 69
  • [45] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [46] OPEN-PIT MINE AT ASBESTOS-HILL
    ROUSSIN, R
    CIM BULLETIN, 1976, 69 (775): : 70 - 74
  • [47] Study on Three-Dimensional Dynamic Stability of Open-Pit High Slope under Blasting Vibration
    Li, Xiaoshuang
    Li, Qihang
    Hu, Yunjin
    Chen, Qiusong
    Peng, Jun
    Xie, Yulin
    Wang, Jiawen
    LITHOSPHERE, 2022, 2021
  • [48] Computer-aided mine planning for an open-pit mine
    Solanki, M.K.S.
    Kanodia, H.K.
    Journal of the Institution of Engineers (India), Part MI: Mining Engineering Division, 1990, 71 (02):
  • [49] 3-DIMENSIONAL CONSIDERATION OF STRESSES SURROUNDING OPEN-PIT MINE SLOPES
    STACEY, TR
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1973, 10 (06): : 523 - 533
  • [50] Study on Complexity Planning Model of Pumped Storage in Abandoned Open-Pit Mine: A Case Study of Fushun Open-Pit Mine
    Luo, Pingjia
    Han, Xueqi
    Chen, Ning
    FRONTIERS IN EARTH SCIENCE, 2022, 10