Debonding Mitigation of Carbon Fiber-Reinforced Polymer- Strengthened Reinforced Concrete Beams with Grooved Bonding

被引:2
作者
Kim, Yail J. [1 ,2 ]
Ibraheem, Ahmed [2 ]
机构
[1] Bridge Engn Inst, Rome, Italy
[2] Univ Colorado Denver, Dept Civil Engn, Denver, CO 80204 USA
关键词
carbon fiber-reinforced polymer (CFRP); debonding; interface; rehabilitation; strengthening; BEHAVIOR;
D O I
10.14359/51721314
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the potential and feasibility of an alternative bonding method for strengthening reinforced concrete beams with carbon fiber-reinforced polymer (CFRP) sheets. Periodic grooves are cut along the tensile soffit of the beams, in the transverse direction, on which CFRP is banded, and filled with an epoxy adhesive to lessen interfacial stresses. The tested bonding schemes comprise three grooves in the vicinity of CFRP termination (the CG3 series) and uniformly distributed grooves in the beam span (the CGD series). The behavior of these beams is investigated in comparison with that of unstrengthened and conventional CFRP-bonded beams with plain substrates. The grooved beams exhibit an over 46% higher load-carrying capacity relative to their conventional counterparts, dependent on a distance from the CFRP termination to the nearest groove. Despite the occurrence of CFRP delamination in the CG3 beams, the epoxy:filled grooves impede the propagation and thus improve the beams' failure loads. For the CGD beams, CFRP delamination is not observed until the beams fail by shear cracking and concrete crushing. The pre-yield stiffness of the grooved beams is enhanced due to the constrained concrete deformation and controlled cracking in tension. The CGD beams show a stable growth in CFRP strain compared with the CG3 beams that experience an irregular stress interaction between the CFRP and substrate. According to analytical modeling, the presence of the grooves at the CFRP termination decreases interfacial stresses by up to 78%. The energy release rate of the grooved interface is examined to account for the delamination mechanisms of the proposed bonding approach.
引用
收藏
页码:59 / 70
页数:12
相关论文
共 22 条
[11]   Using Boring to Postpone Debonding of CFRP-Composite Concrete Beams [J].
Eftekhar, M. R. ;
Ya'ghubi, M. .
JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2016, 20 (01)
[12]  
El-Hacha R., 2001, Progress in Structural Engineering Materials, V3, P111, DOI DOI 10.1002/PSE.76
[13]   Retrofitting of Severely Shear-Damaged Concrete T-Beams Using Externally Bonded Composites and Mechanical End Anchorage [J].
El-Maaddawy, Tamer ;
Chekfeh, Yousef .
JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2012, 16 (06) :693-704
[14]   Shear Strengthening of Concrete Girders Using Carbon Fiber-Reinforced Polymer Sheets and Anchors [J].
Garcia, Jose E. ;
Satrom, C. Neil ;
Jirsa, James O. ;
Ghannoum, Wassim M. .
ACI STRUCTURAL JOURNAL, 2018, 115 (04) :1165-1173
[15]   Investigation into bond behaviour of a new CFRP anchorage system for concrete utilising a mechanically strengthened substrate [J].
Kalfat, R. ;
Al-Mahaidi, R. .
COMPOSITE STRUCTURES, 2010, 92 (11) :2738-2746
[16]  
Khalifa A., 1999, Conc. Int.: Des. Constr, V21, P49
[17]   Grooving as Alternative Method of Surface Preparation to Postpone Debonding of FRP Laminates in Concrete Beams [J].
Mostofinejad, Davood ;
Mahmoudabadi, Ehsan .
JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2010, 14 (06) :804-811
[18]   Experimental investigation into flexural retrofitting of reinforced concrete bridge beams using FRP composites [J].
Pham, H ;
Al-Mahaidi, R .
COMPOSITE STRUCTURES, 2004, 66 (1-4) :617-625
[19]   Interfacial stresses in plated beams [J].
Smith, ST ;
Teng, JG .
ENGINEERING STRUCTURES, 2001, 23 (07) :857-871
[20]   Effect of engineered cementitious composite on the bond behavior between fiber-reinforced polymer and concrete [J].
Sui, Lili ;
Luo, Minshen ;
Yu, Kequan ;
Xing, Feng ;
Li, Pengda ;
Zhou, Yingwu ;
Chen, Cheng .
COMPOSITE STRUCTURES, 2018, 184 :775-788