The probabilistic key-group method

被引:20
作者
Bafghi, ARY
Verdel, T
机构
[1] Ecole Mines, Laego, F-54042 Nancy, France
[2] Yazd Univ, Min Engn Dept, Daneshgah BV, Yazd, Iran
关键词
key-blocks; key-groups; rock slope stability; probabilistic analysis; reliability;
D O I
10.1002/nag.339
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Key-block approaches are widely used in the analysis of rock slopes. The key-group method improves such analyses by taking into account groups of blocks instead of single blocks. Nevertheless, these stability analyses are usually carried out within a context where uncertainty may be a difficult problem to overcome. In the present paper, we propose introducing probabilistic approaches into the key-group method in order to account for uncertainty in the mechanical parameters of the problem to be solved. Both the first-order, second-moment method (FOSM) and the advanced second-moment method (ASMM) are considered herein and compared with Monte-Carlo simulations through the use of five theoretical case studies. Lastly, the probabilistic key-group method (PKGM) is qualified. Copyright (C) 2004 John Wiley Sons, Ltd.
引用
收藏
页码:899 / 917
页数:19
相关论文
共 54 条
  • [1] [Anonymous], 1985, BLOCK THEORY ITS APP
  • [2] PRACTICAL STRUCTURAL RELIABILITY TECHNIQUES
    AYYUB, BM
    HALDAR, A
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1984, 110 (08): : 1707 - 1724
  • [3] Baecher GB, 1998, UNCERTAINTY MODELING AND ANALYSIS IN CIVIL ENGINEERING, P489
  • [4] BAECHER GB, 2000, ELECT COURSE
  • [5] The key-group method
    Bafghi, ARY
    Verdel, T
    [J]. INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2003, 27 (06) : 495 - 511
  • [6] Billson F, 1989, J Pediatr Ophthalmol Strabismus, V26, P3
  • [7] Chowdhury R., 2003, B. Eng. Geol. Environ, V62, P41, DOI [10.1007/s10064-002-0166-1, DOI 10.1007/S10064-002-0166-1]
  • [8] CHRISTIAN JT, 1997, COMPUTERS GEOTECHNIC, V22, P121
  • [9] CHRISTIAN JT, WINN MAN APR 2001
  • [10] CONRAD F, 1973, REV I FR PETROL, V28, P843