Effects of Contractual and Relational Governances on BIM Collaboration and Implementation for Project Performance Improvement

被引:21
作者
Liu, Tianyi [1 ]
Chong, Heap-Yih [2 ]
Zhang, Wei [1 ]
Lee, Cen-Yin [3 ]
Tang, Xi [1 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400045, Peoples R China
[2] Curtin Univ, Sch Design & Built Environm, Perth, WA 6845, Australia
[3] Univ Reading Malaysia, Sch Built Environm, Educity 79200, Johor, Malaysia
关键词
Building information modeling (BIM) collaboration and implementation; Contractual governance; Relational governance; Project performance; Partial least-squares structural equation modeling; INFORMATION MODELING BIM; CONSTRUCTION PROJECTS; MEDIATING ROLE; SUPPLY CHAINS; LIFE-CYCLE; TRUST; MECHANISMS; MANAGEMENT; INTERPLAY; COMPLEMENTARITY;
D O I
10.1061/(ASCE)CO.1943-7862.0002285
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Both contractual and relational governances affect building information modeling (BIM) collaboration and implementation (BCI) to improve project performance. However, the mechanism by which these governances and their interaction influence BCI remains undetermined. Considering transaction cost economics and social exchange theories, this study aimed to investigate the extent of the effect of contractual and relational governances and their interactions on improving BCI. We developed a series of hypotheses and a questionnaire to achieve the aims of the study. The partial least-squares structural equation modeling was applied to analyze the cause-effect relationship arising from the hypotheses. The results show contractual and relational governances affect BCI positively. Contractual governance, which consists of monitoring elements in safeguarding provisions, positively affect BCI and project performance. However, there is no effect found for safeguarding provisions that define the rights of parties in the contract. The study also reveals that contractual governance does not influence relational governance in BCI. This research provides new insights to project managers on the use of effective governance mechanisms to deliver BIM-enabled megaprojects for improving project performance.
引用
收藏
页数:10
相关论文
共 79 条
  • [1] Abdirad H, 2017, ARCHIT ENG DES MANAG, V13, P52, DOI 10.1080/17452007.2016.1183474
  • [2] Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects
    Ahn, Seungjun
    Shokri, Samin
    Lee, SangHyun
    Haas, Carl T.
    Haas, Ralph C. G.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (02)
  • [3] Alreshidi E., 2018, REQUIR ENG, V23, P1, DOI [10.1007/s00766-016-0254-6, DOI 10.1007/s00766-016-0254-6]
  • [4] Alreshidi E., 2014, COMPUT CIV BUILD ENG, V2014, P151, DOI [10.1061/9780784413616.020, DOI 10.1061/9780784413616.020]
  • [5] Factors for effective BIM governance
    Alreshidi, Eissa
    Mourshed, Monjur
    Rezgui, Yacine
    [J]. JOURNAL OF BUILDING ENGINEERING, 2017, 10 : 89 - 101
  • [6] Management control for market transactions: The relation between transaction characteristics, incomplete contract design, and subsequent performance
    Anderson, SW
    Dekker, HC
    [J]. MANAGEMENT SCIENCE, 2005, 51 (12) : 1734 - 1752
  • [7] Collaborative governance in theory and practice
    Ansell, Chris
    Gash, Alison
    [J]. JOURNAL OF PUBLIC ADMINISTRATION RESEARCH AND THEORY, 2008, 18 (04) : 543 - 571
  • [8] Complementarity and evolution of contractual provisions: An empirical study of IT services contracts
    Argyres, Nicholas S.
    Bercovitz, Janet
    Mayer, Kyle J.
    [J]. ORGANIZATION SCIENCE, 2007, 18 (01) : 3 - 19
  • [9] Beccerra M., 1999, Public Administration Quarterly, V23, P177
  • [10] CONTRACT DESIGN CHOICES AND THE BALANCE OF EX ANTE AND EX POST TRANSACTION COSTS IN SOFTWARE DEVELOPMENT OUTSOURCING
    Benaroch, Michel
    Lichtenstein, Yossi
    Fink, Lior
    [J]. MIS QUARTERLY, 2016, 40 (01) : 57 - 82