Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty

被引:0
|
作者
Ouyang Yong-liu [1 ]
Zhang Meng-xiang [1 ]
Han Lu [1 ]
Lu Yi [1 ]
机构
[1] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
来源
2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II | 2015年
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
construction project; fuzzy uncertainty; genetic algorithm; multiproject time -cost trade-off scheduling problem; MULTICRITERIA DECISION-MAKING; GENETIC ALGORITHM; OPTIMIZATION;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper presents a multiproject time-cost trade-off scheduling problem (mPTCTSP) for large-scale construction systems with multiple modes under fuzzy environment. A multiobjective decision making model is established in the total project duration which is regarded as a fuzzy variable. The fuzzy numbers in the model are defuzzified by using an expected value operator with an optimistic-pessimistic index. The multiobjective fuzzy optimization model designed in this study aims to simultaneously minimize project duration and delaying punishment cost. Furthermore, the hybrid genetic algorithm with fuzzy logic controller (flc-hGA) is developed to find feasible solutions. Finally, the Jinping-II Hydroelectric Project is used as a practical example to demonstrate the practicality and efficiency of the model.
引用
收藏
页码:282 / 292
页数:11
相关论文
共 50 条