Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty

被引:0
|
作者
Ouyang Yong-liu [1 ]
Zhang Meng-xiang [1 ]
Han Lu [1 ]
Lu Yi [1 ]
机构
[1] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Peoples R China
来源
2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II | 2015年
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
construction project; fuzzy uncertainty; genetic algorithm; multiproject time -cost trade-off scheduling problem; MULTICRITERIA DECISION-MAKING; GENETIC ALGORITHM; OPTIMIZATION;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper presents a multiproject time-cost trade-off scheduling problem (mPTCTSP) for large-scale construction systems with multiple modes under fuzzy environment. A multiobjective decision making model is established in the total project duration which is regarded as a fuzzy variable. The fuzzy numbers in the model are defuzzified by using an expected value operator with an optimistic-pessimistic index. The multiobjective fuzzy optimization model designed in this study aims to simultaneously minimize project duration and delaying punishment cost. Furthermore, the hybrid genetic algorithm with fuzzy logic controller (flc-hGA) is developed to find feasible solutions. Finally, the Jinping-II Hydroelectric Project is used as a practical example to demonstrate the practicality and efficiency of the model.
引用
收藏
页码:282 / 292
页数:11
相关论文
共 50 条
  • [1] Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling
    Liu, Dian
    Li, Heng
    Wang, Hongwei
    Qi, Chao
    Rose, Timothy
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 148
  • [2] Discrete time-cost-environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project
    Xu, Jiuping
    Zheng, Huan
    Zeng, Ziqiang
    Wu, Shiyong
    Shen, Manbin
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (08) : 950 - 966
  • [3] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [4] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [5] Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems
    Agdas, Duzgun
    Warne, David J.
    Osio-Norgaard, Jorge
    Masters, Forrest J.
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (01)
  • [6] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
  • [7] Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling
    Bettemir, Onder Halis
    Yucel, Tugay
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (02) : 293 - 309
  • [8] Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    Vanhoucke, Mario
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 43 (05) : 1173 - 1202
  • [9] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [10] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637