Simultaneous multi-criteria optimization for scheduling linear infrastructure projects

被引:35
作者
Eid, Mohamed S. [1 ]
Elbeltagi, Emad E. [2 ]
El-Adaway, Islam H. [3 ,4 ]
机构
[1] Arab Acad Sci Technol & Maritime, Dept Construct & Bldg Engn, Cairo, Egypt
[2] Mansoura Univ, Struct Engn Dept, Mansoura, Egypt
[3] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO USA
[4] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO USA
关键词
Construction; schedules; repetitive; decision analysis; multi-criteria optimization; GENETIC ALGORITHMS; CONSTRUCTION; MODEL; CPM;
D O I
10.1080/15623599.2018.1505027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a simultaneous multi-criteria optimization approach for scheduling linear infrastructure projects. The proposed model provides planners with sets of non-dominated alternatives and their corresponding tradeoffs. The associated research methodology includes: (1) developing a resource driven scheduling module; (2) applying a multi-criteria optimization technique to optimize the multi-objective scheduling problem; (3) integrating the proposed model with a commercial project management software; and (4) applying the developed model on two literature-drawn case studies. The developed multi-criteria optimization approach utilizes Genetic Algorithms and Pareto Front sorting. The resulting sets of schedules are based on the multiple inter-conflicting objectives of simultaneously minimizing project duration, minimizing cost, minimizing interruptions, and minimizing unit delivery delays. The results indicate that the proposed approach can explore a greater range of solutions compared to existing models. The developed multi-criteria optimization approach can aid planners with proposing optimal set of schedules.
引用
收藏
页码:41 / 55
页数:15
相关论文
共 49 条
[1]   LOB and CPM Integrated Method for Scheduling Repetitive Projects [J].
Ammar, Mohammad A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :44-50
[2]  
[Anonymous], tems: an introductory analysis with applications to biology
[3]   An effective multi-objective approach to prioritisation of sewer pipe inspection [J].
Berardi, L. ;
Giustolisi, O. ;
Savic, D. A. ;
Kapelan, Z. .
WATER SCIENCE AND TECHNOLOGY, 2009, 60 (04) :841-850
[4]   Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[5]   CONSTRUCTION SCHEDULING - PRINCIPLES, PRACTICES, AND 6 CASE-STUDIES [J].
COLE, LJR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (04) :579-588
[6]  
Dolabi HAZ., 2016, CONSTRUCTION RES C R
[7]   Linear Scheduling Model with Varying Production Rates [J].
Duffy, Gregory A. ;
Oberlender, Garold D. ;
Jeong, David Hyung Seok .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (08) :574-582
[8]   Integrating the Social Vulnerability of Host Communities and the Objective Functions of Associated Stakeholders during Disaster Recovery Processes Using Agent-Based Modeling [J].
Eid, Mohamed S. ;
El-adaway, Islam H. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (05)
[9]   Sustainable Disaster Recovery: Multiagent-Based Model for Integrating Environmental Vulnerability into Decision-Making Processes of the Associated Stakeholders [J].
Eid, Mohamed S. ;
El-adaway, Islam H. .
JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2017, 143 (01)
[10]   Sustainable Disaster Recovery Decision-Making Support Tool: Integrating Economic Vulnerability into the Objective Functions of the Associated Stakeholders [J].
Eid, Mohamed S. ;
El-adaway, Islam H. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (02)