共 13 条
[3]
A New Approach in Multi-Objective Portfolio Optimization using Value-at-Risk based Risk Measure
[J].
2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE),
2010,
:765-769
[4]
Galloway S., 2006, IET Proceedings- Generation, Transmission and Distribution, V153, P1
[8]
Optimal timing for generation investment with uncertain emission mitigation policy
[J].
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER,
2011, 21 (01)
:1015-1027