共 50 条
- [21] Hot rolling steel tube batch scheduling with earliness/tardiness penalties Li, J.-X. (jianxiang_li@hotmail.com), 2005, Northeast University (20):
- [23] A hybrid algorithm for earliness-tardiness scheduling problem with sequence dependent setup time PROCEEDINGS OF THE 36TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-5, 1997, : 1219 - 1222
- [26] A block approach to earliness-tardiness scheduling problems The International Journal of Advanced Manufacturing Technology, 2009, 40 : 797 - 807
- [27] A block approach to earliness-tardiness scheduling problems INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (7-8): : 797 - 807
- [30] Chemical Reaction Optimization for Earliness-Tardiness Scheduling problem APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 2594 - 2598