A graph theoretic approach to evaluate the intensity of barriers in the implementation of total productive maintenance (TPM)

被引:33
作者
Attri, Rajesh [1 ]
Grover, Sandeep [1 ]
Dev, Nikhil [1 ]
机构
[1] YMCA Univ Sci & Technol, Dept Mech Engn, Faridabad, India
关键词
IOB; barriers; intensity of barriers; GTA; total productive maintenance; STEAM POWER-PLANT; FAILURE CAUSE ANALYSIS; GTA-BASED FRAMEWORK; SUPPLY CHAINS; EQUIPMENT EFFECTIVENESS; AUTOMOBILE VEHICLE; DIGRAPH APPROACH; MATRIX; SELECTION; MANAGEMENT;
D O I
10.1080/00207543.2013.860250
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Total productive maintenance (TPM) is an innovative approach to maintenance which holds the potential for enhancing effectiveness of production facilities. But, implementation of TPM is not an easy task. Innumerable barriers are encountered in real-life cases during TPM implementation. It is very essential to evaluate the nature and impact of these barriers so that production and maintenance managers can cultivate some strategies to overcome these barriers. In the present exertion, a graph theoretic approach has been applied to find the intensity of these barriers through an index which is computed through a permanent function obtained from the digraph of TPM barriers.
引用
收藏
页码:3032 / 3051
页数:20
相关论文
共 117 条
[1]   An international study of quality improvement approach and firm performance [J].
Adam, EE ;
Corbett, LM ;
Flores, BE ;
Harrison, NJ ;
Lee, TS ;
Rho, BH ;
Ribera, J ;
Samson, D ;
Westbrook, R .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1997, 17 (9-10) :842-+
[2]   An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise [J].
Ahuja, I. ;
Khamba, J. .
JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2007, 13 (04) :338-+
[3]   An evaluation of TPM initiatives in Indian industry for enhanced manufacturing performance [J].
Ahuja, I. ;
Khamba, J. .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2008, 25 (02) :147-+
[4]   Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry [J].
Ahuja, I. P. S. ;
Khamba, J. S. .
JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (02) :123-+
[5]   Total productive maintenance: literature review and directions [J].
Ahuja, I. P. S. ;
Khamba, J. S. .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2008, 25 (07) :709-+
[6]   A case study of total productive maintenance implementation at precision tube mills [J].
Ahuja, I. P. S. ;
Kumar, Pankaj .
JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2009, 15 (03) :241-+
[7]   Measuring horizontal collaboration intensity in supply chain: a graph-theoretic approach [J].
Anand, G. ;
Bahinipati, Bikram K. .
PRODUCTION PLANNING & CONTROL, 2012, 23 (10-11) :801-816
[8]   Evaluation of supply chain collaboration: a case of apparel retail industry in India [J].
Anbanandam, R. ;
Banwet, D. K. ;
Shankar, Ravi .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2011, 60 (02) :82-+
[9]  
[Anonymous], J MANAGERIAL ISSUES
[10]   A framework for evaluation of coordination by contracts: A case of two-level supply chains [J].
Arshinder ;
Kanda, Arun ;
Deshmukh, S. G. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) :1177-1191