共 50 条
- [41] THE SPACE BETWEEN THE BRIDGES + THE CONSTRUCTION OF THE RAILWAY TUNNEL IN ROTTERDAM LOTUS INTERNATIONAL, 1990, 64 : 60 - 63
- [43] Construction of the "Karaburma Desni" railway tunnel in saturated sands GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 1951 - 1954
- [45] The Key Technology of Design and Construction on Menghua Heavy-haul Railway Tunnel by Mining Method Zheng, Yu-Chao (zhengyc218@126.com), 1600, Chang'an University (33): : 77 - 91
- [46] Analysis of the behaviour of an old railway tunnel due to the construction of a Lisbon Metro tunnel MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 717 - 722
- [47] The alleviation of pressure transients in a main line railway tunnel 9TH INTERNATIONAL CONFERENCE ON AERODYNAMICS AND VENTILATION OF VEHICLE TUNNELS: DEVELOPMENTS FOR THE 21ST CENTURY, 1997, (27): : 849 - 862
- [48] Measurements of transient ground movements below a ballasted railway line GEOTECHNIQUE, 2010, 60 (09): : 667 - 677
- [50] Design and construction of the Guadarrama tunnel Revista de Obras Publicas, 2002, 149 (3426): : 7 - 49