共 14 条
[1]
ANTIL JM, 1990, CRITICAL METHOD CONS
[2]
Banks J., 2009, DISCRETE EVENT SYSTE, V5th
[3]
CARR RI, 1974, J CONSTRUCT DIV-ASCE, V100, P403
[4]
Optimizing resource utilization for repetitive construction projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (01)
:18-27
[5]
ELSAYEGH SM, 1998, THESIS TEXAS T M U
[6]
Scheduling with computer-interpretable construction method models
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (04)
:337-347
[7]
Scheduling projects with repeating activities
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (04)
:269-278
[8]
JOHNSTON DW, 1981, J CONSTRUCTION DIVIS, V107
[10]
Liu W., 2005, P 2005 INT C COMP CI