A Stochastic Shortest Path Framework for Quantifying the Value and Lifetime of Battery Energy Storage Under Dynamic Pricing

被引:23
作者
Tan, Xiaoqi [1 ]
Wu, Yuan [2 ]
Tsang, Danny H. K. [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Elect & Comp Engn, Hong Kong, Hong Kong, Peoples R China
[2] Zhejiang Univ Technol, Coll Informat Engn, Hangzhou 310023, Zhejiang, Peoples R China
基金
浙江省自然科学基金; 中国国家自然科学基金;
关键词
Absorbing Markov chain (AMC); battery energy storage (BES); stochastic shortest path (SSP); value and lifetime;
D O I
10.1109/TSG.2015.2478599
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper aims at quantifying the value of a lifetime-constrained battery energy storage system (BESS) operated by a consumer who faces fluctuating electricity prices. We define the lifetime of the BESS as the serving duration within which the BESSs capacity stays above a certain threshold of its initial capacity and define the value of the BESS as the total peak-shaving value within its entire lifetime. Under the assumption that the price dynamics are Markovian, we show that maximizing the average value of the BESS can be formulated as a stochastic shortest path (SSP) problem, and the average lifetime corresponds to the average number of steps before being absorbed in the SSP problem. We propose an efficient parallel value iteration algorithm to solve the proposed SSP problem with guarantees of achieving optimality and a fast convergence. We also derive a closed form expression for the average lifetime based on the principle of an embedded absorbing Markov chain. We validate our model and algorithm on a practical BESS via real price data sets from two different markets. Comparison of the computational efficiency between the standard Gauss-Seidel value iteration and our parallel algorithm is also illustrated through extensive simulation.
引用
收藏
页码:769 / 778
页数:10
相关论文
共 25 条
  • [1] [Anonymous], 2014, RENEWABLES BOOM NEED
  • [2] [Anonymous], 2013, TESLA CONSIDERS BUIL
  • [3] [Anonymous], 2013, BRIGHT LIGHTS BIG CI
  • [4] [Anonymous], 1999, STOCH MODEL SER, DOI 10.1201/9781315140223
  • [5] [Anonymous], 2012, Dynamic Programming and Optimal Control
  • [6] [Anonymous], 2013, GRID EN STOR
  • [7] [Anonymous], 2015, 43 BATTERY STORAGE C
  • [8] Bertsekas D. P., 1996, NEURODYNAMIC PROGRAM
  • [9] Bindner H., 2005, RISOR1515EN RISO NAT
  • [10] Ehrlich G.M., 2002, HDB BATTERIES