Fast Approaches to Improve the Robustness of a Railway Timetable

被引:120
作者
Fischetti, Matteo [1 ]
Salvagnin, Domenico [2 ]
Zanette, Arrigo [2 ]
机构
[1] Univ Padua, Dept Informat Engn, I-35131 Padua 1, Italy
[2] Univ Padua, Dept Pure & Appl Math, I-35121 Padua 1, Italy
关键词
timetabling; integer programming; robustness; stochastic programming; robust optimization;
D O I
10.1287/trsc.1090.0264
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The train timetabling problem (TTP) consists of finding a train schedule on a railway network that satisfies some operational constraints and maximizes some profit function that accounts for the efficiency of the infrastructure usage. In practical cases, however, the maximization of the objective function is not enough, and one calls for a robust solution that is capable of absorbing, as much as possible, delays/disturbances on the network. In this paper we propose and computationally analyze four different methods to improve the robustness of a given TTP solution for the aperiodic ( noncyclic) case. The approaches combine linear programming (LP) and ad hoc stochastic programming/robust optimization techniques. We computationally compare the effectiveness and practical applicability of the four techniques under investigation on real-world test cases from the Italian railway company Trenitalia. The outcome is that two of the proposed techniques are very fast and provide robust solutions of comparable quality with respect to the standard ( but very time consuming) stochastic programming approach.
引用
收藏
页码:321 / 335
页数:15
相关论文
共 23 条
[1]  
[Anonymous], ARRIVALTR0116
[2]  
BARBER F, 2008, ARRIVALD34
[3]  
Birge J.R., 1997, SPRINGER SERIES OPER
[4]   A Lagrangian heuristic algorithm for a real-world train timetabling problem [J].
Caprara, A ;
Monaci, M ;
Toth, P ;
Guida, PL .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (05) :738-753
[5]   Modeling and solving the train timetabling problem [J].
Caprara, A ;
Fischetti, M ;
Toth, P .
OPERATIONS RESEARCH, 2002, 50 (05) :851-861
[6]   IMPORTANCE SAMPLING IN MONTE-CARLO ANALYSES [J].
CLARK, CE .
OPERATIONS RESEARCH, 1961, 9 (05) :603-620
[7]  
FISCHETTI M, 2007, ATMOS 2007 7 WORKSH
[8]  
FISCHETTI M, 2008, ARRIVALTR0119
[9]  
HOFMAN M, 2006, ATMOS 2006 6 WORKSH
[10]  
*ILOG INC, 2007, ILOG CPLEX 10 1 US M