An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem

被引:0
|
作者
Jolai, F. [1 ]
Tavakkoli-Moghaddam, R. [1 ]
Rabiee, M. [2 ]
Gheisariha, E. [3 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
[2] KN Toosi Univ Technol, Dept Ind Engn, Tehran, Iran
[3] Univ Tehran, Dept Ind Engn, Tehran 14174, Iran
关键词
IWO; Flexible flow shop; Response surface methodology; Rework; Transportation time; Anticipatory sequence dependent setup time; SEQUENCE-DEPENDENT SETUP; HYBRID FLOWSHOPS; MEMETIC ALGORITHM; BOUND ALGORITHM; SHOP; 2-STAGE; TIMES; BRANCH; RULES; LINES;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In previous investigations in the field of flexible flow shop scheduling problems, the rework probability for operations was ignored. As these kinds of problems are NP-hard, we present an Enhanced Invasive Weed Optimization (EIWO) algorithm in order to solve the addressed problem with probable rework times, transportation times with a conveyor between two subsequent stages, different ready times and anticipatory sequence dependent setup times. The optimization criterion is to minimize makespan. Although Invasive Weed Optimization (IWO) is an efficient meta-heuristic algorithm and has been used by many researchers recently, to increase the capability of IWO, we added a mutation operation to enhance the exploration in order to prevent sticking in local optimum. In addition, an affinity function is embedded to obstruct premature convergence. With these changes, we balance the exploration and exploitation of IWO. Since the performance of our proposed algorithm depends on parameters values, we apply the popular design of an experimental methodology, called the Response Surface Method (RSM). To evaluate the proposed algorithm, first, some random test problems are generated and compared with three benchmark algorithms. The related results are analyzed by statistical tools. The experimental results and statistical analyses demonstrate that the proposed EIWO is effective for the problem. (C) 2014 Sharif University of Technology. All rights reserved.
引用
收藏
页码:1007 / 1020
页数:14
相关论文
共 50 条
  • [1] A Deep Reinforcement Learning Approach to the Flexible Flowshop Scheduling Problem with Makespan Minimization
    Zhu, Jialin
    Wang, Huangang
    Zhang, Tao
    PROCEEDINGS OF 2020 IEEE 9TH DATA DRIVEN CONTROL AND LEARNING SYSTEMS CONFERENCE (DDCLS'20), 2020, : 1220 - 1225
  • [2] An algorithm based on Evolution Strategies for makespan minimization in hybrid flexible flowshop scheduling problems
    de Siqueira, Eduardo C.
    Souza, Marcone J. F.
    de Souza, Sergio R.
    de Franca Filho, Moacir F.
    Marcelino, Carolina Gil
    2013 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2013, : 989 - 996
  • [3] Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem
    Keshavarz, Taha
    Salmasi, Nasser
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (20) : 6182 - 6193
  • [4] Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations
    Chung, Yu-Hsiang
    Tong, Lee-Ing
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (1-4): : 355 - 367
  • [5] An optimization model for flexible routing based flowshop scheduling problem
    Wang, Qing
    Wang, Fan
    Liu, Shu-an
    Qi, Yanhui
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 1984 - 1989
  • [6] A novel discrete artificial bee colony algorithm for the hybrid flowshop scheduling problem with makespan minimisation
    Pan, Quan-Ke
    Wang, Ling
    Li, Jun-Qing
    Duan, Jun-Hua
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 45 : 42 - 56
  • [7] A memetic algorithm for the re-entrant permutation flowshop scheduling problem to minimize the makespan
    Xu, Jianyou
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    Gu, Shusheng
    APPLIED SOFT COMPUTING, 2014, 24 : 277 - 283
  • [8] An effective discrete invasive weed optimization algorithm for lot-streaming flowshop scheduling problems
    Sang, Hong-Yan
    Pan, Quan-Ke
    Duan, Pei-Yong
    Li, Jun-Qing
    JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (06) : 1337 - 1349
  • [9] Makespan minimization in flowshop batch processing problem with different batch compositions on machines
    Main, Hossein N. Z.
    Salmasi, Nasser
    Shahvari, Omid
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 193 : 832 - 844
  • [10] A flexible flowshop problem with total flow time minimization
    Azizoglu, M
    Çakmak, E
    Kondakci, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 132 (03) : 528 - 538