Revised load shedding schedule for power system incorporating the effect of transmission line performance

被引:6
作者
Chandekar, SM [1 ]
Tarnekar, SG [1 ]
机构
[1] NIT Lay Out, Nagpur 440022, Maharashtra, India
关键词
under-frequency; revised load-shedding; transmission line;
D O I
10.1016/S0142-0615(01)00035-7
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
There is a growing trend towards the use of sophisticated relays like frequency trend relays for the purpose of automatic load shedding to avert the major system collapses due to integrated operation of modern power system. Accurate load shedding saves loss of revenue to power utility in addition to avoiding unnecessary disruption of vital feeders. Face values of NW capacities of generation outages are normally used for estimating the system overloading and consequent quantum of load shed to recover the system to safe workable frequency. Inherent dependence of transmission line parameters upon the system frequency affects the line performance in terms of its reduced output during under-frequency condition. The paper has attempted to present a modified load shedding scheme incorporating the relieving effect of transmission network and showed the advantages over the conventional method. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:379 / 386
页数:8
相关论文
共 7 条
[1]   Performance of uncompensated and series capacitor-compensated 500 kV long transmission line under subnormal frequency conditions [J].
Chandekar, SM ;
Tarnekar, SG .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1998, 145 (03) :315-319
[2]  
CHAUHAN RC, 1984, PUBLICATION CBIP, V170, P131
[3]  
DWARKANATH AR, 2000, IEEMA J, P37
[4]   APPLICATION OF UNDERFREQUENCY RELAYS FOR AUTOMATIC LOAD SHEDDING [J].
LAKAY, HE ;
BURTNYK, V .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1968, PA87 (03) :776-&
[5]  
RAO TSM, 1979, POWER SYSTEM PROTECT, P443
[6]  
RATHORE JL, 1988, P 6 NAT C POW SYST N
[7]  
STEVENSON WD, 1982, ELEMENTS POWER SYSTE, P107