Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings

被引:68
作者
Liu, Hexu [1 ]
Sydora, Christoph [2 ]
Altaf, Mohammed Sadiq [3 ]
Han, SangHyeok [4 ]
Al-Hussein, Mohamed [5 ]
机构
[1] Western Michigan Univ, Dept Civil & Construct Engn, Kalamazoo, MI 49008 USA
[2] Univ Alberta, Dept Comp Sci, Edmonton, AB T6G 2E8, Canada
[3] ACQBUILT, 4303 55 Ave NW, Edmonton, AB T6B 3S8, Canada
[4] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
[5] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB T6G 1H9, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
BIM; Roof sheathing; Off-site construction; Waste minimization; Construction design and planning; Sustainable construction; WASTE MANAGEMENT; DEMOLITION WASTE; MAIN CAUSES; MINIMIZATION; OPTIMIZATION; AGGREGATE; STRATEGIES; REDUCTION; RESOURCE; CONCRETE;
D O I
10.1016/j.jclepro.2019.07.055
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Off-site construction and building information model (BIM) technology bring benefits to the construction industry in many respects, such as reduced material waste, and lead to solutions towards sustainable construction. Nevertheless, despite the uptake of off-site construction methods and BIM, massive construction waste in terms of sheathing material (e.g., oriented strand board) is still yielded in the light frame building industry. This research thus presents an automated BIM-based approach to reducing sheathing material waste by enabling a proactive design and planning of roof sheathing installation for prefabricated buildings. Specifically, a BIM-based sheathing layout design algorithm, which incorporates trades know-how, is developed to achieve the construction design automation. A hybrid algorithm integrating greedy algorithm and particle swarm algorithm is applied in connection with the design algorithm to optimize material cutting plans for the generated layout with the objective of minimizing sheathing material waste. Two case studies are presented to demonstrate the feasibility and effectiveness of the proposed approach in terms of roof sheathing material waste reduction. The results are summarized to provide deeper insights in terms of sheathing waste reduction for more sustainable construction practice. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1189 / 1201
页数:13
相关论文
共 46 条
[1]  
Ahankoob Alireza., 2012, BIM PERSPECTIVES ON CONSTRUCTION WASTE REDUCTION, P195
[2]   Critical design factors for minimising waste in construction projects: A structural equation modelling approach [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. .
RESOURCES CONSERVATION AND RECYCLING, 2018, 137 :302-313
[3]   Attributes of design for construction waste minimization: A case study of waste-to-energy project [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. ;
Akinade, Olugbenga O. ;
Bilal, Muhammad ;
Alaka, Hafiz A. ;
Owolabi, Hakeem A. ;
Kadiri, Kabir O. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 73 :1333-1341
[4]   Critical management practices influencing on-site waste minimization in construction projects [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. ;
Bilal, Muhammad ;
Akinade, Olugbenga O. ;
Alaka, Hafiz A. ;
Owolabi, Hakeem A. .
WASTE MANAGEMENT, 2017, 59 :330-339
[5]   Influence of recycled concrete aggregate on volumetric properties of hot mix asphalt [J].
Al-Bayati, Hanaa Khaleel Alwan ;
Tighe, Susan L. ;
Achebe, Jessica .
RESOURCES CONSERVATION AND RECYCLING, 2018, 130 :200-214
[6]   Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices [J].
Al-Hajj, Assem ;
Hamani, Karima .
ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2011, 7 (04) :221-235
[7]  
[Anonymous], BIM HDB GUIDE BUILDI
[8]   Heuristic for the rectangular two-dimensional single stock size cutting stock problem with two-staged patterns [J].
Cui, Yaodong ;
Zhao, Zhigang .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 231 (02) :288-298
[9]   Heuristics for two-dimensional knapsack and cutting stock problems with items of irregular shape [J].
Del Valle, Aline M. ;
de Queiroz, Thiago A. ;
Miyazawa, Flavio K. ;
Xavier, Eduardo C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (16) :12589-12598
[10]   Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD [J].
Ding, Lieyun ;
Zhou, Ying ;
Akinci, Burcu .
AUTOMATION IN CONSTRUCTION, 2014, 46 :82-93