Stochastic scheduling for a two-machine open shop

被引:1
作者
Righter, R
机构
关键词
open shop; makespan; stochastic scheduling; coupling;
D O I
10.2307/3215098
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
We study the problem of preemptive scheduling of jobs in a two-machine open shop. Jobs require processing on both machines, but the order does not matter. We define the D-LERPT (double longest expected remaining processing time) policy as the policy that first processes jobs that have not yet been processed by either machine (double jobs), in decreasing order of expected remaining processing times, and then processes jobs that require processing on only one machine in any order. We show that D-LERPT stochastically minimizes the makespan when preemption is not permitted and jobs (but not machines) are stochastically identical, and that D-LERPT minimizes the makespan in the increasing convex sense when preemption is permitted and the machines are stochastically identical and processing times are exponential or geometric with a job dependent rate.
引用
收藏
页码:733 / 744
页数:12
相关论文
共 6 条
[1]   THE OPTIMALITY OF LEPT IN PARALLEL MACHINE SCHEDULING [J].
CHANG, CS ;
RIGHTER, R .
JOURNAL OF APPLIED PROBABILITY, 1994, 31 (03) :788-796
[2]  
FROSTIG E, 1997, IN PRESS OPERAT RES
[3]  
Pinedo M., 1984, Annals of Operations Research, V1, P305, DOI 10.1007/BF01874395
[4]  
Pinedo M., 1995, Scheduling: Theory, Algorithms, and Systems, V2nd
[5]   MINIMIZING EXPECTED MAKESPAN IN STOCHASTIC OPEN SHOPS [J].
PINEDO, ML ;
ROSS, SM .
ADVANCES IN APPLIED PROBABILITY, 1982, 14 (04) :898-911
[6]  
Ross S. M., 1983, STOCHASTIC PROCESSES