Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times

被引:26
作者
Behjat, Saeed [1 ]
Salmasi, Nasser [2 ]
机构
[1] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[2] Corning Inc, Wilmington, NC 28405 USA
关键词
no-wait flowshop; group scheduling; minimisation of total completion time; sequence dependent setup time; mathematical programming; metaheuristics; FLOWLINE MANUFACTURING CELL; HEURISTIC ALGORITHM; SEARCH; MACHINE;
D O I
10.1504/EJIE.2017.081418
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this research, the no-wait flowshop sequence dependent group scheduling problem with minimisation of total completion time, noted as F-m|nwt, fmls, S-plk|Sigma C-j is approached. A mixed integer linear mathematical model is proposed for the research problem. Due to the NP-hard nature of the proposed problem, several metaheuristic algorithms based on particle swarm optimisation and variable neighbourhood search with different neighbourhood search structures are proposed to heuristically solve the problem. Also, an efficient heuristic algorithm is proposed to generate the initial feasible solutions for the proposed algorithms. The performances of the proposed algorithms are compared with each other and the best available one in the literature by using available test problems in the literature. Based on the results, the proposed metaheuristics with structure oriented initial solutions have a better performance than the algorithms with random-generated initial solutions. [ Received 14 July 2015; Revised 22 September 2015; Accepted 30 May 2016]
引用
收藏
页码:22 / 48
页数:27
相关论文
共 36 条
[21]   Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups [J].
Logendran, R ;
Salmasi, N ;
Sriskandarajah, C .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (01) :158-180
[22]  
Montgomery D., 2013, DESIGN ANAL EXPT, V8
[23]   Permutation flowshops in group scheduling with sequence-dependent setup times [J].
Naderi, B. ;
Salmasi, Nasser .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) :177-198
[24]   A HEURISTIC ALGORITHM FOR THE M-MACHINE, N-JOB FLOWSHOP SEQUENCING PROBLEM [J].
NAWAZ, M ;
ENSCORE, EE ;
HAM, I .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1983, 11 (01) :91-95
[26]   A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime [J].
Pan, Quan-Ke ;
Ruiz, Ruben .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) :117-128
[27]   THE 3-MACHINE NO-WAIT FLOWSHOP IS NP-COMPLETE [J].
ROCK, H .
JOURNAL OF THE ACM, 1984, 31 (02) :336-345
[28]  
Salmasi N., 2008, J IND ENG INT, V8, P48
[29]  
Salmasi N., 2005, THESIS
[30]   Makespan minimization of a flowshop sequence-dependent group scheduling problem [J].
Salmasi, Nasser ;
Logendran, Rasaratnam ;
Skandari, Mohammad Reza .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (5-8) :699-710