Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times

被引:26
作者
Behjat, Saeed [1 ]
Salmasi, Nasser [2 ]
机构
[1] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[2] Corning Inc, Wilmington, NC 28405 USA
关键词
no-wait flowshop; group scheduling; minimisation of total completion time; sequence dependent setup time; mathematical programming; metaheuristics; FLOWLINE MANUFACTURING CELL; HEURISTIC ALGORITHM; SEARCH; MACHINE;
D O I
10.1504/EJIE.2017.081418
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this research, the no-wait flowshop sequence dependent group scheduling problem with minimisation of total completion time, noted as F-m|nwt, fmls, S-plk|Sigma C-j is approached. A mixed integer linear mathematical model is proposed for the research problem. Due to the NP-hard nature of the proposed problem, several metaheuristic algorithms based on particle swarm optimisation and variable neighbourhood search with different neighbourhood search structures are proposed to heuristically solve the problem. Also, an efficient heuristic algorithm is proposed to generate the initial feasible solutions for the proposed algorithms. The performances of the proposed algorithms are compared with each other and the best available one in the literature by using available test problems in the literature. Based on the results, the proposed metaheuristics with structure oriented initial solutions have a better performance than the algorithms with random-generated initial solutions. [ Received 14 July 2015; Revised 22 September 2015; Accepted 30 May 2016]
引用
收藏
页码:22 / 48
页数:27
相关论文
共 36 条
[1]   Multi-objective scheduling of dynamic job shop using variable neighborhood search [J].
Adibi, M. A. ;
Zandieh, M. ;
Amiri, M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (01) :282-287
[2]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[3]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[4]   Total completion time with makespan constraint in no-wait flowshops with setup times [J].
Allahverdi, Ali ;
Aydilek, Harun .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 238 (03) :724-734
[5]  
[Anonymous], 1995, QUALITY ENG USING RO
[6]   Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem [J].
Arabameri, Sedighe ;
Salmasi, Nasser .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) :902-916
[7]   Heuristic algorithm for scheduling in the no-wait flow-shop [J].
Bertolissi, E .
JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2000, 107 (1-3) :459-465
[8]   Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups [J].
França, PM ;
Gupta, JND ;
Mendes, AS ;
Moscato, P ;
Veltink, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) :491-506
[9]   Discrete harmony search algorithm for the no-wait flow shop scheduling problem with total flow time criterion [J].
Gao, Kai-zhou ;
Pan, Quan-ke ;
Li, Jun-qing .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (5-8) :683-692
[10]   Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization [J].
Gao, Kaizhou ;
Pan, Quanke ;
Suganthan, P. N. ;
Li, Junqing .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12) :1563-1572