共 22 条
- [1] Adam A., 2014, P 19 INT S ADV CONST
- [2] Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI DOI 10.1016/S0263-7863(98)00060-X
- [3] [Anonymous], CONSTR ECON BUILD
- [4] [Anonymous], 2016, Journal of Construction in Developing Countries, V21, P51, DOI [DOI 10.21315/JCDC2016.21.1.4, 10.21315/jcdc2016.21.1]
- [5] Arantes A., 2015, IND ENG SYST MAN IES
- [6] Causes of delay in large construction projects[J]. Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia. Int. J. Proj. Manage., 2006(349-357)
- [7] Challal A., 2012, Journal of Service Science and Management, V05, P151, DOI [https://doi.org/10.4236/jssm.2012.52019, DOI 10.4236/JSSM.2012.52019]
- [8] Corder G.W., 2014, NONPARAMETRIC STAT S, V2nd
- [9] El-Sayegh Sameh Monir, 2008, International Journal of Project Management, V26, P431, DOI 10.1016/j.ijproman.2007.07.004
- [10] Analysis of Causes of Delay and Time Performance in Construction Projects[J]. Gonzalez, Pablo;Gonzalez, Vicente;Molenaar, Keith;Orozco, Francisco. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014(01)