3D coupled mechanical and hydraulic modeling of a geosynthetic-reinforced deep mixed column-supported embarkment

被引:178
作者
Huang, Jie [1 ]
Han, Jie [2 ]
机构
[1] Calif Dept Transportat, Off Geotech Design S 1, Div Engn Serv, Los Angeles, CA 90012 USA
[2] Univ Kansas, CEAE Dept, Lawrence, KS 66045 USA
关键词
Coupled modeling; Three-dimensional; Geosynthetic-reinforced column-supported embankment; Settlement; Tension; Excess pore water pressure; NUMERICAL-ANALYSIS; EMBANKMENTS; BEHAVIOR; PLATFORMS; DESIGN;
D O I
10.1016/j.geotexmem.2009.01.001
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Numerical studies were conducted to improve the understanding of the behavior of geosynthetic-reinforced column-supported embankments. Due to the complexity of the problem, so far, consolidation process and three-dimensional patterns of columns have not been well simulated in most published numerical studies. As a result, the time-dependant behavior and the serviceability of this system have not been well evaluated. In this study, a three-dimensional coupled mechanical and hydraulic modeling was conducted using FLAC3D to consider consolidation and three-dimensional arrangement of columns. This study was based on a well-documented bridge approach embankment reinforced by a layer of geotextile and supported by deep mixed (DM) columns. The foundation soils including soft clay and silt, the embankment fill, and the deep mixed columns were modeled as linearly elastic-perfectly plastic materials with Mohr-Coulomb failure criteria. The geotextile reinforcement was simulated by geogrid elements incorporated in the FIAC3D software, which can sustain in-plane tensile force only. The staged construction was simulated by building the embankment in lifts. The duration of each lift was the same as the actual construction time plus the lapse time between two consecutive stages. The development of settlement and tension in the geotextile with time is compared with the long-term monitoring data and yields good agreement. The generation and dissipation of excess pore water pressure during and after construction are presented and discussed. Published by Elsevier Ltd.
引用
收藏
页码:272 / 280
页数:9
相关论文
共 33 条
[1]   A simplified method for analysis of a piled embankment reinforced with geosynthetics [J].
Abusharar, Sari W. ;
Zheng, Jun-Jie ;
Chen, Bao-Guo ;
Yin, Jian-Hua .
GEOTEXTILES AND GEOMEMBRANES, 2009, 27 (01) :39-52
[2]  
Alexiew D., 1999, Proc. of Geossinteticos'99, P403
[3]   2D and 3D numerical simulations of reinforced embankments on soft ground [J].
Bergado, Dennes T. ;
Teerawattanasuk, Chairat .
GEOTEXTILES AND GEOMEMBRANES, 2008, 26 (01) :39-55
[4]   Design of geosynthetic-reinforced platforms spanning localized sinkholes [J].
Briancon, Laurent ;
Villard, Pascal .
GEOTEXTILES AND GEOMEMBRANES, 2008, 26 (05) :416-428
[5]  
*BRIT STAND I, 1995, BS8006 COD PRACT STR
[6]  
BRUCE DA, 2001, VERIFICATION PROPERT, V3
[7]  
Carlsson B., 1987, Reinforced soil, principles for calculation
[8]   An experimental investigation of soil arching within basal reinforced and unreinforced piled embankments [J].
Chen, Yun-min ;
Cao, Wei-ping ;
Chen, Ren-peng .
GEOTEXTILES AND GEOMEMBRANES, 2008, 26 (02) :164-174
[9]   Physicochemical and engineering behavior of cement treated clays [J].
Chew, SH ;
Kamruzzaman, AHM ;
Lee, FH .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2004, 130 (07) :696-706
[10]  
COLLIN JG, 2003, 10 FHWA