Optimal reorder point inventory models with variable lead time and backorder discount considerations

被引:43
作者
Pan, JCH
Lo, MC
Hsiao, YC
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Sect 4, Taipei 106, Taiwan
[2] Takming Coll, Taipei, Taiwan
关键词
inventory; lead time; crashing cost; backorder discount; service level;
D O I
10.1016/S0377-2217(03)00366-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Lead time reduction has been one of the major factors in the successful implementation of the popular just-in-time inventory system. In many practical situations, this controllable lead time can be decomposed into several components, each having a crashing cost for the reduced lead time and the associated crashing expenses contains a fixed cost and a variable cost per unit product. If an item is out of stock in an inventory system in which shortage is allowed, the supplier may offer a negotiable price discount to the loyal, patient and captive customers to compensate for the inconvenience of backordering. This paper studies the integrated inventory systems with the objective to simultaneously optimizing the order quantity, lead time, backordering and reorder point. There are two inventory models proposed in the paper, one with normally distributed demand, and another with generally distributed demand. Numerical examples are included to illustrate the procedures of the algorithms. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:488 / 505
页数:18
相关论文
共 18 条
[1]  
[Anonymous], 1987, OPERATIONS RES PRINC
[2]   INVENTORY MODELS INVOLVING LEAD TIME AS A DECISION VARIABLE [J].
BENDAYA, M ;
RAOUF, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (05) :579-582
[3]  
GALLEGO G, 1993, J OPER RES SOC, V44, P825, DOI 10.1057/jors.1993.141
[4]   Some stochastic inventory models with deterministic variable lead time [J].
Hariga, M ;
Ben-Daya, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) :42-51
[5]  
HARIGA M, 2000, PRODUCTION PLANNING, V10, P434
[6]   Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions [J].
Hariga, MA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (11) :1340-1345
[7]   LOT-SIZE DEPENDENT LEAD TIMES IN A Q,R INVENTORY SYSTEM [J].
KIM, JS ;
BENTON, WC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (01) :41-58
[8]  
Krajewski L., 1996, Operations management: strategy and analysis
[9]  
LIAO CJ, 1991, INT J OPER PROD MAN, V11, P72
[10]   The multi-item newsvendor problem with a budget constraint and fixed ordering costs [J].
Moon, I ;
Silver, EA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (05) :602-608