Performance of a Flexible Manufacturing System Operating Under Part Movement Policy and Tool Movement Policy: Simulation Modelling and Analysis

被引:0
作者
Kumar N, Suresh [1 ]
Sridharan, R. [2 ]
机构
[1] Coll Engn, Dept Mech Engn, Adoor 691551, Kerala, India
[2] Natl Inst Technol Calicut, Dept Mech Engn, Calicut 673601, Kerala, India
来源
IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3 | 2008年
关键词
Flexible Manufacturing System; Part Movement; Scheduling; Simulation; Tool Movement;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper focuses on the simulation studies conducted to evaluate the performance of a flexible manufacturing system (FMS) operating under two different scenarios: part movement policy and tool movement policy. A typical configuration of FMS is considered for the purpose of experimentation. A discrete-event simulation model of the FMS is developed for each of the two scenarios. it number of scheduling rules are incorporated in the simulation model for part scheduling decision. The performance measures considered are mean flow time, mean tardiness, percentage of tardy parts and mean utilization of machines. The simulation results are subjected to statistical analysis. For the FMS considered in the present study, tool movement policy is found to perform significantly better when compared with the part movement policy.
引用
收藏
页码:1754 / +
页数:2
相关论文
共 9 条
[1]   TOOL SHARING IN AN FMS - A FEASIBILITY STUDY [J].
GAALMAN, GJ ;
NAWIJN, WM ;
PLATZER, LW .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4) :107-115
[2]   High performance loading robot design for a tool-delivery system [J].
Gougar, H ;
Cho, S ;
Prabhu, V .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (14) :3401-3424
[3]   PERFORMANCE ANALYSIS OF A LIM-BASED HIGH-SPEED TOOL DELIVERY SYSTEM FOR MACHINING [J].
HAHN, HS ;
SANDERS, JL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (01) :179-207
[4]   Analysis of tool sharing in an FMS: A simulation study [J].
Kashyap, AS ;
Khator, SK .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (01) :137-145
[5]  
Kelton DW, 2000, SIMULATION MODELLING
[6]   Tool requirements in manufacturing systems under dynamic tool sharing [J].
Koo, PH ;
Tanchoco, JMA ;
Talavage, JJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) :537-540
[7]   Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation [J].
Lee, CS ;
Kim, SS ;
Choi, JS .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (01) :61-73
[8]   Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter [J].
Roh, HK ;
Kim, YD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) :2989-3003
[9]  
Stecke K., 1985, ANN OPER RES, V3, P3