Barriers to the development of prefabricated buildings in China: a news coverage analysis

被引:55
作者
Li, Zhen [1 ]
Zhang, Shaowen [2 ]
Meng, Qingfeng [1 ]
Hu, Xin [3 ]
机构
[1] Jiangsu Univ, Sch Management, Zhenjiang, Jiangsu, Peoples R China
[2] Jiangsu Univ, Zhenjiang, Jiangsu, Peoples R China
[3] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
基金
中国国家自然科学基金;
关键词
Prefabricated buildings; Obstacle factors; News analysis methods; Sustainability; China; OFF-SITE CONSTRUCTION; MODULAR CONSTRUCTION; BIM; STAKEHOLDERS; NEWSPAPERS; DIFFUSION; SYSTEMS; RISKS;
D O I
10.1108/ECAM-03-2020-0195
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The Chinese construction industry is experiencing a rapid growth these days. Due to the requirements of energy conservation, emission reduction and construction waste management, the development of prefabricated buildings (PBs) has attracted much attention in the Chinese construction industry. However, the development of PBs are still in their infancy in China, which have been negatively impacted by many obstacles. It is of great significance to clarify and analyze these obstacles for the purpose of promoting the development of PBs in China. Due to the wideness and complex features of obstacles, the existing literature exploring the research topic lacks comprehensiveness. The purpose of this paper is to systematically identify and discuss the obstacles that hinder the development of PBs in China. Design/methodology/approach This paper adopts the method of news report analysis based on the news reports retrieved from China National Knowledge Infrastructure (CNKI) and nine major portals in China. The Term Frequency-Inverse Document Frequency (TF-IDF) method of content analysis was used to rank the obstacles according to their importance. Findings A total of 79 obstacles to the development of PBs in China are identified, and the 79 obstacles are divided into 8 dimensions. Among the Top 20 obstacles, the government dimension accounted for the highest number of 5, the market and consumer dimension and development organization dimension were 4, Manufacturing Enterprise of Prefabricated Components (PCs) dimension, construction organization dimension and design organization dimension were 2, logistics enterprise dimension was 1, and industry association dimension was 0. Among them, the biggest obstacle is the high transportation costs. Research limitations/implications First, data collection may not be very comprehensive. Second, this paper is only based on the obstacles in the development of PBs in China, and the universality of the management conclusions needs to be further strengthened. Practical implications The research results help the stakeholders in the Chinese PBs industry to better understand the barriers hindering the industry development in a systemic way, which will help propose appropriate strategies to address these barriers. Originality/value This paper clarifies the obstacles of China's PBs and makes an analysis, which is of great value to the development of China's PBs.
引用
收藏
页码:2884 / 2903
页数:20
相关论文
共 67 条
[1]   BIM in off-site manufacturing for buildings [J].
Abanda, F. H. ;
Tah, J. H. M. ;
Cheung, F. K. T. .
JOURNAL OF BUILDING ENGINEERING, 2017, 14 :89-102
[2]   Lean approach in precast concrete component production [J].
Ahmad, Suryani ;
Soetanto, Robby ;
Goodier, Chris .
BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2019, 9 (03) :457-470
[3]   Accounting for Transport Times in Planning Off-Site Shipment of Construction Materials [J].
Ahmadian, F. F. Alireza ;
Akbarnezhad, Ali ;
Rashidi, Taha H. ;
Waller, S. Travis .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
[4]   How do the news media frame crises? A content analysis of crisis news coverage [J].
An, Seon-Kyoung ;
Gower, Karla K. .
PUBLIC RELATIONS REVIEW, 2009, 35 (02) :107-112
[5]   Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling [J].
Bortolini, Rafaela ;
Formoso, Carlos Torres ;
Viana, Daniela D. .
AUTOMATION IN CONSTRUCTION, 2019, 98 :248-264
[6]   BIM-oriented data mining for thermal performance of prefabricated buildings [J].
Casasanta Garcia, Lucianne ;
Kamsu-Foguem, Bernard .
ECOLOGICAL INFORMATICS, 2019, 51 :61-72
[7]   Unlocking the green opportunity for prefabricated buildings and construction in China [J].
Chang, Yuan ;
Li, Xiaodong ;
Masanet, Eric ;
Zhang, Lixiao ;
Huang, Zhiye ;
Ries, Robert .
RESOURCES CONSERVATION AND RECYCLING, 2018, 139 :259-261
[8]  
Chen C., 2017, MAJOR BARRIERS DIFFE
[9]   Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis [J].
Choi, Jin Ouk ;
O'Connor, James T. ;
Kim, Tae Wan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)
[10]  
Dou YD, 2019, KSCE J CIV ENG, V23, P3737