EXPERIMENTAL STUDY OF PRECAST BEAM-COLUMN HIDDEN CORBEL CONNECTION UNDER CYCLIC LOADING

被引:0
作者
Vahid, Saeid Zahedi [1 ]
Osman, Siti Aminah [1 ]
Ansari, Mohammad [1 ]
Ibrahim, Nurasyikin [1 ]
机构
[1] Univ Kebangsaan Malaysia, Fac Engn & Built Environm, Ukm Bangi 43600, Selangor, Malaysia
关键词
Crack pattern; Cyclic loading; Ductility; Hidden corbel connection; Stiffness;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The aim of this study is to investigate the behavior of hidden corbel precast beam to column connection due to cyclic loading by conducting laboratory test. Two types of connections were selected namely monolithic connection and hidden corbel connection. Both of the connections were having the same size of 100 mm x 100 mm x 1200 mm (Base x Width x Height) for column and 100 mm x 100 mm x 550 mm for beam. The monolithic connection acted as a control model with rigid type of connection while hidden corbel was a semi-rigid connection. Both models were subjected to a vertical cyclic loading until 40mm displacement using 500 kN actuator. Hysteresis load versus displacement graphs were generated and the connection behavior for both models were studied in terms of strength, ductility, stiffness and crack patterns. Based on the results, ductility of hidden corbel was equal to 3, which were higher than the monolithic. The hidden corbel connection was also experienced less degradation of stiffness and cyclic strength. This can be proved by less visible crack pattern that occurred at the connection. With that regard, hidden corbel connection model is more suitable to be used for cyclic loading and at the area prone to seismic loading.
引用
收藏
页码:9 / 18
页数:10
相关论文
共 50 条
[11]   An experimental study on R.C beam-column joints under cyclic loading [J].
Nagaraju, Avari ;
Suda, V. B. Reddy .
MATERIALS TODAY-PROCEEDINGS, 2022, 52 :608-616
[12]   Experimental investigation of a new precast column-foundation connection under cyclic loading [J].
Cogurcu, Mustafa Tolga ;
Uzun, Mehmet .
JOURNAL OF BUILDING ENGINEERING, 2022, 50
[13]   Development of a monolithic-like precast beam-column moment connection: Experimental and analytical investigation [J].
Senturk, Mehmet ;
Pul, Selim ;
Ilki, Alper ;
Hajirasouliha, Iman .
ENGINEERING STRUCTURES, 2020, 205
[14]   An Experimental and Numerical Analysis of Steel Beam-Column Connection with Sacrificial Components Under Pseudo-Static Loading [J].
Pratap, Monedra ;
Vesmawala, Gaurang R. ;
Kumar, Praveen .
INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2025, 23 (05) :951-972
[15]   Cyclic Behavior of Beam-Column Connections in Precast Structures [J].
Meydanli Atalay, Hilal ;
Ozden, Sevket .
FRONTIERS IN BUILT ENVIRONMENT, 2021, 7
[16]   FRP strengthened SHS beam-column connection under monotonic and large-deformation cyclic loading [J].
Tafsirojjaman, T. ;
Fawzia, Sabrina ;
Thambiratnam, David P. ;
Zhao, Xiao-Ling .
THIN-WALLED STRUCTURES, 2021, 161
[17]   Comparison of Composite Beam-Column Connection Development Under Cyclic Loading Using Finite Element Modelling [J].
Septiarsilia, Yanisfa ;
Iranata, Data ;
Suswanto, Budi .
CIVIL AND ENVIRONMENTAL ENGINEERING, 2025, 28 (01) :127-144
[18]   Experimental characterization of the moment-rotation relationship of the beam-column connection in precast concrete [J].
Simoes Hadade, Maria Angela ;
Catoia, Bruna ;
Ferreira, Marcelo de Araujo ;
Carvalho, Roberto Chust .
MATERIA-RIO DE JANEIRO, 2018, 23 (03)
[19]   Experimental study on cyclic loading characteristics of fly ash as partial replacement of cement in beam-column joint [J].
Shaw, Sayan Kumar ;
Sil, Arjun .
CASE STUDIES IN CONSTRUCTION MATERIALS, 2020, 13
[20]   Behavior of RC Eccentric Corner Beam-Column Joint under Cyclic Loading: An Experimental Work [J].
Basha, A. M. ;
Fayed, Sabry .
CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (02) :295-308