Total completion time with makespan constraint in no-wait flowshops with setup times

被引:36
作者
Allahverdi, Ali [1 ]
Aydilek, Harun [2 ]
机构
[1] Kuwait Univ, Dept Ind & Management Syst, Kuwait, Kuwait
[2] Gulf Univ Sci & Technol, Dept Math & Nat Sci, Kuwait, Kuwait
关键词
Scheduling; No-wait flowshop; Setup times; Total completion time; Makespan; MACHINE SCHEDULING PROBLEM; HYBRID GENETIC ALGORITHM; FLOW-SHOP PROBLEM; PERMUTATION FLOWSHOP; MAXIMUM LATENESS; DIFFERENTIAL EVOLUTION; UP TIMES; HEURISTICS; SUBJECT; OPTIMIZATION;
D O I
10.1016/j.ejor.2014.04.031
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The m-machine no-wait flowshop scheduling problem with the objective of minimizing total completion time subject to the constraint that the makespan value is not greater than a certain value is addressed in this paper. Setup times are considered non-zero values, and thus, setup times are treated as separate from processing times. Several recent algorithms, an insertion algorithm, two genetic algorithms, three simulated annealing algorithms, two cloud theory-based simulated annealing algorithms, and a differential evolution algorithm are adapted and proposed for the problem. An extensive computational analysis has been conducted for the evaluation of the proposed algorithms. The computational analysis indicates that one of the nine proposed algorithms, one of the simulated annealing algorithms (ISA-2), performs much better than the others under the same computational time. Moreover, the analysis indicates that the algorithm ISA-2 performs significantly better than the earlier existing best algorithm. Specifically, the best performing algorithm, ISA-2, proposed in this paper reduces the error of the existing best algorithm in the literature by at least 90% under the same computational time. All the results have been statistically tested. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:724 / 734
页数:11
相关论文
共 44 条
[21]   No-wait two-stage multiprocessor flow shop scheduling with unit setup [J].
Huang, Rong-Hwa ;
Yang, Chang-Lin ;
Huang, Yau-Chi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10) :921-927
[22]   A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times [J].
Jolai, F. ;
Rabiee, M. ;
Asefi, H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) :7447-7466
[23]   A constructive heuristic for minimizing makespan in no-wait flow shop scheduling [J].
Laha, Dipak ;
Chakraborty, Uday K. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (1-2) :97-109
[24]   Multi-objective no-wait flowshop scheduling problems: models and algorithms [J].
Naderi, B. ;
Aminnayeri, M. ;
Piri, M. ;
Yazdi, M. H. Ha'iri .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) :2592-2608
[25]   A new evolutionary clustering search for a no-wait flow shop problem with set-up times [J].
Nagano, Marcelo Seido ;
da Silva, Augusto Almeida ;
Nogueira Lorena, Luiz Antonio .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (06) :1114-1120
[26]   A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem [J].
Pan, Quan-Ke ;
Tasgetiren, M. Fatih ;
Liang, Yun-Chia .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (09) :2807-2839
[27]   A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness [J].
Pang, King-Wah .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) :127-136
[28]   Development of lower bounds for the scheduling of setup tasks in serial production lines [J].
Pessan, Cedric ;
Neron, Emmanuel ;
Haouari, Mohamed .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 7 (05) :558-576
[29]   A DE-based approach to no-wait flow-shop scheduling [J].
Qian, B. ;
Wang, L. ;
Hu, R. ;
Huang, D. X. ;
Wang, X. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :787-805
[30]   Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics [J].
Rabiee, M. ;
Zandieh, M. ;
Jafarian, A. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) :7428-7446