Total completion time with makespan constraint in no-wait flowshops with setup times

被引:36
作者
Allahverdi, Ali [1 ]
Aydilek, Harun [2 ]
机构
[1] Kuwait Univ, Dept Ind & Management Syst, Kuwait, Kuwait
[2] Gulf Univ Sci & Technol, Dept Math & Nat Sci, Kuwait, Kuwait
关键词
Scheduling; No-wait flowshop; Setup times; Total completion time; Makespan; MACHINE SCHEDULING PROBLEM; HYBRID GENETIC ALGORITHM; FLOW-SHOP PROBLEM; PERMUTATION FLOWSHOP; MAXIMUM LATENESS; DIFFERENTIAL EVOLUTION; UP TIMES; HEURISTICS; SUBJECT; OPTIMIZATION;
D O I
10.1016/j.ejor.2014.04.031
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The m-machine no-wait flowshop scheduling problem with the objective of minimizing total completion time subject to the constraint that the makespan value is not greater than a certain value is addressed in this paper. Setup times are considered non-zero values, and thus, setup times are treated as separate from processing times. Several recent algorithms, an insertion algorithm, two genetic algorithms, three simulated annealing algorithms, two cloud theory-based simulated annealing algorithms, and a differential evolution algorithm are adapted and proposed for the problem. An extensive computational analysis has been conducted for the evaluation of the proposed algorithms. The computational analysis indicates that one of the nine proposed algorithms, one of the simulated annealing algorithms (ISA-2), performs much better than the others under the same computational time. Moreover, the analysis indicates that the algorithm ISA-2 performs significantly better than the earlier existing best algorithm. Specifically, the best performing algorithm, ISA-2, proposed in this paper reduces the error of the existing best algorithm in the literature by at least 90% under the same computational time. All the results have been statistically tested. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:724 / 734
页数:11
相关论文
共 44 条
[1]   No-wait flowshops with bicriteria of makespan and total completion time [J].
Allahverdi, A ;
Aldowaisan, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (09) :1004-1015
[2]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[3]  
Allahverdi A., 2014, J INTELLIGE IN PRESS
[4]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[5]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[6]   Algorithms for no-wait flowshops with total completion time subject to makespan [J].
Allahverdi, Ali ;
Aydilek, Harun .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12) :2237-2251
[7]   Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem [J].
Arabameri, Sedighe ;
Salmasi, Nasser .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) :902-916
[8]   An environment-driven, function-based approach to dynamic single-machine scheduling [J].
Atighehchian, Arezoo ;
Sepehri, Mohammad Mehdi .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 7 (01) :100-118
[9]   Heuristics for no-wait flowshops with makespan subject to mean completion time [J].
Aydilek, Harun ;
Allahverdi, Ali .
APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (01) :351-359
[10]   Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated [J].
Brown, SI ;
McGarvey, R ;
Ventura, JA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (06) :614-621